X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274280910000

Well Details

Well ID: 0274280910000
Loading map...
Location: 00/10-09-027-28W4/0
Location Alias: 00/10-09-27-28 W4M
Location Alias 2: 00/10-09-027-28 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 28
Section: 09
County/Municipality: Rocky View County
Well Name: EMBER CROSS 10-9-27-28
Operator Name: Ember Resources Inc.
License Number: 0409787
License Date: 2009-03-18
License Status: Amended
Spud Date: 2009-11-21
Final Drill Date: 2009-12-08
Well Total Depth: 1279.00 m
Surface Hole Latitude: 51.291511
Surface Hole Longitude: -113.878675

For data sources see[1][2]

Well History

Date Event
2009-03-18 Obtained License
2009-11-21 Surface Casing Operation Performed
2009-12-08 Finished Drilling
2009-12-08 Production Casing Operation Performed
2009-12-08 Rig Released
2009-12-08 Well Mode changed to Drilled and Cased
2009-12-12 Well Log Performed
2010-01-19 Perforation Treatment Performed - Jet Perforation
2010-02-12 Perforation Treatment Performed - Jet Perforation
2010-02-20 Perforation Treatment Performed - Fractured
2010-03-03 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-19 Perforation 744.00 747.00 13
2010-02-12 Perforation 493.00 493.50 14
2010-02-12 Perforation 673.00 675.00 14
2010-02-12 Perforation 801.00 802.00 14
2010-02-12 Perforation 517.00 518.00 14
2010-02-12 Perforation 633.00 634.00 14
2010-02-12 Perforation 481.70 482.20 14
2010-02-12 Perforation 486.00 486.50 14
2010-02-12 Perforation 827.00 828.00 14
2010-02-12 Perforation 480.30 480.80 14
2010-02-12 Perforation 758.00 758.50 14
2010-02-12 Perforation 555.40 555.90 14
2010-02-12 Perforation 904.30 905.30 14
2010-02-12 Perforation 908.80 909.30 14
2010-02-12 Perforation 884.40 884.90 14
2010-02-12 Perforation 900.00 901.00 14
2010-02-12 Perforation 923.50 924.50 14
2010-02-12 Perforation 943.00 943.50 14
2010-02-12 Perforation 920.40 920.90 14
2010-02-12 Perforation 921.80 922.30 14
2010-02-12 Perforation 875.50 876.00 14
2010-02-12 Perforation 773.00 773.50 14
2010-02-12 Perforation 623.30 623.80 14
2010-02-12 Perforation 814.20 814.70 14
2010-02-12 Perforation 766.90 767.40 14
2010-02-12 Perforation 769.80 770.30 14
2010-02-12 Perforation 834.00 834.50 14
2010-02-12 Perforation 850.20 850.70 14
2010-02-12 Perforation 867.00 869.00 14
2010-02-12 Perforation 836.80 837.30 14
2010-02-20 Fracture 480.30 943.50 0
2010-02-12 Perforation 495.90 496.40 14
2010-02-12 Perforation 497.60 498.10 14
2010-02-12 Perforation 689.00 689.50 14
2010-02-12 Perforation 718.00 720.00 14
2010-02-12 Perforation 641.50 642.00 14
2010-02-12 Perforation 643.20 644.20 14

For data sources see[4]



References