If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274282316000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.328066,"lon":-113.827645,"icon":""}]} |
| Location: 00/16-23-027-28W4/0 | |
| Location Alias: 00/16-23-27-28 W4M | |
| Location Alias 2: 00/16-23-027-28 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 28 | |
| Section: 23 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER CROSS 16-23-27-28 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0408194 | |
| License Date: 2009-01-20 | |
| License Status: Suspension | |
| Spud Date: 2009-10-13 | |
| Final Drill Date: 2009-10-14 | |
| Well Total Depth: 1258.00 m | |
| Surface Hole Latitude: 51.328066 | |
| Surface Hole Longitude: -113.827645 |
| Date | Event |
|---|---|
| 2009-01-20 | Obtained License |
| 2009-10-13 | Lost Circulation Occurred |
| 2009-10-13 | Surface Casing Operation Performed |
| 2009-10-14 | Finished Drilling |
| 2009-10-14 | Well Mode changed to Drilled and Cased |
| 2009-10-15 | Production Casing Operation Performed |
| 2009-10-15 | Rig Released |
| 2009-10-26 | Well Log Performed |
| 2009-11-17 | Perforation Treatment Performed - Jet Perforation |
| 2009-12-10 | Perforation Treatment Performed - Fractured |
| 2009-12-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2009-12-14 | Well Mode changed to Testing |
| 2009-12-18 | Well Began Production |
| 2009-12-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2009-12-18 | Well Mode changed to Flowing |
| 2019-01-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2019-01-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-11-17 | Perforation | 537.20 | 537.70 | 13 |
| 2009-11-17 | Perforation | 267.00 | 270.00 | 13 |
| 2009-11-17 | Perforation | 637.00 | 639.00 | 13 |
| 2009-11-17 | Perforation | 729.00 | 731.00 | 13 |
| 2009-11-17 | Perforation | 690.00 | 692.00 | 13 |
| 2009-11-17 | Perforation | 658.00 | 659.00 | 13 |
| 2009-11-17 | Perforation | 822.60 | 823.10 | 13 |
| 2009-11-17 | Perforation | 814.10 | 814.60 | 13 |
| 2009-11-17 | Perforation | 810.30 | 811.30 | 13 |
| 2009-11-17 | Perforation | 851.00 | 853.00 | 13 |
| 2009-11-17 | Perforation | 843.00 | 843.50 | 13 |
| 2009-11-17 | Perforation | 467.90 | 468.40 | 13 |
| 2009-11-17 | Perforation | 828.00 | 828.50 | 13 |
| 2009-11-17 | Perforation | 807.80 | 809.80 | 13 |
| 2009-11-17 | Perforation | 684.80 | 685.30 | 13 |
| 2009-11-17 | Perforation | 743.90 | 744.40 | 13 |
| 2009-11-17 | Perforation | 741.50 | 742.00 | 13 |
| 2009-11-17 | Perforation | 755.50 | 756.00 | 13 |
| 2009-11-17 | Perforation | 790.60 | 791.10 | 13 |
| 2009-11-17 | Perforation | 774.30 | 776.30 | 13 |
| 2009-12-10 | Fracture | 267.00 | 270.00 | 0 |
| 2009-12-10 | Fracture | 397.90 | 843.50 | 0 |
| 2009-11-17 | Perforation | 397.90 | 398.40 | 13 |
| 2009-12-10 | Fracture | 851.00 | 853.00 | 0 |
| 2009-11-17 | Perforation | 540.50 | 541.00 | 13 |
| 2009-11-17 | Perforation | 677.40 | 677.90 | 13 |
| 2009-11-17 | Perforation | 619.00 | 619.50 | 13 |
| 2009-11-17 | Perforation | 550.60 | 551.60 | 13 |
| 2009-11-17 | Perforation | 577.00 | 579.00 | 13 |
| 2009-11-17 | Perforation | 481.00 | 483.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 340 | 0.0 | 0.0 | 0.0 |
| 2010 | 8743 | 0.0 | 0.0 | 0.0 |
| 2011 | 8753 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8740 | 0.0 | 0.0 | 0.0 |
| 2015 | 7813 | 0.0 | 0.0 | 0.0 |
| 2018 | 720 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2009-10-13 | Lost Circulation | 60.00 | 63.00 |
For data sources see[6]