If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0275050711000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.292678,"lon":-114.699784,"icon":""}]} |
| Location: 00/11-07-027-05W5/0 | |
| Location Alias: 00/11-07-27-05 W5M | |
| Location Alias 2: 00/11-07-027-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 07 | |
| County/Municipality: Rocky View County | |
| Well Name: Canlin WCATH 11-7-27-5 | |
| Operator Name: Canlin Energy Corporation | |
| License Number: 0020571 | |
| License Date: 1961-03-17 | |
| License Status: Suspension | |
| Spud Date: 1961-05-28 | |
| Final Drill Date: 1961-11-17 | |
| Well Total Depth: 2920.30 m | |
| Surface Hole Latitude: 51.292678 | |
| Surface Hole Longitude: -114.699784 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1961-03-17 | Obtained License |
| 1961-05-28 | Direction Drilling Operation Performed - 98 |
| 1961-11-05 | Production Casing Operation Performed |
| 1961-11-17 | Finished Drilling |
| 1961-11-17 | Perforation Treatment Performed - Open-Hole Completion |
| 1961-11-17 | Well Mode changed to Drilled and Cased |
| 1961-11-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1961-12-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1962-01-01 | Perforation Treatment Performed - Jet Perforation |
| 1962-01-03 | Drill Stem Test Performed |
| 1962-01-04 | Drill Stem Test Performed |
| 1962-01-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1962-01-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1962-06-02 | Well Began Production |
| 1962-06-02 | Well Fluid changed to Gas |
| 1962-06-02 | Well Mode changed to Flowing |
| 1965-06-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1965-06-29 | Perforation Treatment Performed - Condensate Squeeze |
| 2003-11-04 | Well Log Performed |
| 2003-11-05 | Well Log Performed |
| 2003-11-08 | Well Log Performed |
| 2003-11-15 | Well Log Performed |
| 2003-11-19 | Well Log Performed |
| 2003-11-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2003-11-21 | Perforation Treatment Performed - Cement Squeeze |
| 2003-11-21 | Plug Back Performed |
| 2003-11-21 | Well Fluid changed to Gas |
| 2003-11-21 | Well Mode changed to Abandoned and Whipstocked |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1961-05-28 | 824.80 | Conversion |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1961-11-17 | Open Hole/Barefoot Completion | 2865.10 | 2920.30 | 0 |
| 2003-11-21 | Packing Device Capped w/Cement | 2797.00 | 2828.00 | 0 |
| 1961-11-30 | Acid Treatment | 2865.10 | 2920.30 | 0 |
| 1961-12-11 | Acid Treatment | 2865.10 | 2920.30 | 0 |
| 1962-01-01 | Perforation | 2845.60 | 2857.20 | 13 |
| 1962-01-20 | Acid Treatment | 2865.10 | 2920.30 | 0 |
| 1962-01-28 | Acid Treatment | 2865.10 | 2920.30 | 0 |
| 1965-06-29 | Acid Treatment | 2845.60 | 2920.30 | 0 |
| 1965-06-29 | Condensate Squeeze | 2845.60 | 2920.30 | 0 |
| 2003-11-21 | Cement Squeeze | 2845.60 | 2857.20 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 0 | 0.0 | 0.0 | 0.0 |
| 1968 | 0 | 0.0 | 0.0 | 0.0 |
| 1969 | 8576 | 0.0 | 0.0 | 0.0 |
| 1970 | 8667 | 0.0 | 0.0 | 0.0 |
| 1971 | 8518 | 0.0 | 0.0 | 0.0 |
| 1972 | 4211 | 0.0 | 0.0 | 0.0 |
| 1973 | 5108 | 0.0 | 0.0 | 0.0 |
| 1974 | 4476 | 0.0 | 0.0 | 0.0 |
| 1975 | 3655 | 0.0 | 0.0 | 0.0 |
| 1976 | 1331 | 0.0 | 0.0 | 0.0 |
| 1977 | 992 | 0.0 | 0.0 | 0.0 |
| 1978 | 222 | 0.0 | 0.0 | 0.0 |
| 1979 | 1078 | 0.0 | 0.0 | 0.0 |
| 1980 | 772 | 0.0 | 0.0 | 0.0 |
| 1981 | 37 | 0.0 | 0.0 | 0.0 |
| 1982 | 48 | 0.0 | 0.0 | 0.0 |
| 1983 | 42 | 0.0 | 0.0 | 0.0 |
| 1984 | 182 | 0.0 | 0.0 | 0.0 |
| 1985 | 1266 | 0.0 | 0.0 | 0.0 |
| 1986 | 620 | 0.0 | 0.0 | 0.0 |
| 1987 | 2142 | 0.0 | 0.0 | 0.0 |
| 1988 | 4019 | 0.0 | 0.0 | 0.0 |
| 1989 | 4054 | 0.0 | 0.0 | 0.0 |
| 1990 | 1135 | 0.0 | 0.0 | 0.0 |
| 1991 | 336 | 0.0 | 0.0 | 0.0 |
| 1992 | 6264 | 0.0 | 0.0 | 0.0 |
| 1993 | 7119 | 0.0 | 0.0 | 0.0 |
| 1994 | 8545 | 0.0 | 0.0 | 0.0 |
| 1995 | 6872 | 0.0 | 0.0 | 0.0 |
| 1996 | 1703 | 0.0 | 0.0 | 0.0 |
| 1997 | 3221 | 0.0 | 0.0 | 0.0 |
For data sources see[6]