X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275080104000

Well Details

Well ID: 0275080104000
Loading map...
Location: 00/04-01-027-08W5/0
Location Alias: 00/04-01-27-08 W5M
Location Alias 2: 00/04-01-027-08 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 08
Section: 01
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin SALTER 4-1-27-8
Operator Name: Canlin Energy Corporation
License Number: 0045740
License Date: 1973-05-11
License Status: Abandoned
Spud Date: 1973-06-22
Final Drill Date: 1973-09-11
Well Total Depth: 2895.60 m
Surface Hole Latitude: 51.272012
Surface Hole Longitude: -115.009131

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-05-11 Obtained License
1973-09-11 Finished Drilling
1973-09-14 Production Casing Operation Performed
1973-09-18 Well Log Performed
1973-09-22 Perforation Treatment Performed - Jet Perforation
1973-09-23 Perforation Treatment Performed - Jet Perforation
1973-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-10-11 Perforation Treatment Performed - Alcohol Squeeze
1973-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-03-13 Well Mode changed to Drilled and Cased
1990-04-09 Well Began Production
1990-04-09 Well Fluid changed to Gas
1990-04-09 Well Mode changed to Flowing
1991-11-01 Well Log Performed
1993-09-02 Well Log Performed
1993-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Suspended
2003-07-07 Well Log Performed
2003-07-09 Perforation Treatment Performed - Cement Squeeze
2003-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-11 Perforation Treatment Performed - Jet Perforation
2003-07-11 Plug Back Performed
2003-07-11 Well Fluid changed to Gas
2003-07-11 Well Log Performed
2003-07-11 Well Mode changed to Abandoned Zone
2003-07-12 Perforation Treatment Performed - Bridge Plug No Cement Required
2003-07-12 Perforation Treatment Performed - Remedial Casing
2003-07-16 Well Log Performed
2003-07-18 Perforation Treatment Performed - Jet Perforation
2003-07-19 Well Log Performed
2003-07-25 Perforation Treatment Performed - Fractured
2003-07-30 Perforation Treatment Performed - Cement Plug
2003-07-30 Perforation Treatment Performed - Cement Squeeze
2003-07-30 Plug Back Performed
2003-07-31 Perforation Treatment Performed - Jet Perforation
2003-08-01 Perforation Treatment Performed - Jet Perforation
2003-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-02 Perforation Treatment Performed - Remedial Casing
2003-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-03 Perforation Treatment Performed - Jet Perforation
2003-08-03 Perforation Treatment Performed - Remedial Casing
2004-06-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-09-22 Perforation 2713.30 2722.20 3
1993-09-03 Packing Device Capped w/Cement 2678.00 2681.00 0
2003-07-09 Cement Squeeze 2658.30 2672.40 0
2003-07-11 Packing Device Capped w/Cement 2578.10 2588.10 0
2003-07-11 Perforation 1642.00 1643.00 17
2003-07-11 Perforation 1679.00 1680.00 17
2003-07-12 Remedial Casing Cementing 1679.00 1680.00 0
2003-07-12 Remedial Casing Cementing 1642.00 1643.00 0
2003-07-12 Bridge Plug, No Cement 1676.00 1679.00 0
2003-07-18 Perforation 1660.00 1666.50 17
2003-07-25 Fracture 1660.00 1666.50 0
1973-09-23 Perforation 2722.20 2731.00 3
2003-07-30 Cement Squeeze 1660.00 1666.50 0
2003-07-30 Cement Plug 1299.00 1300.00 0
2003-07-31 Perforation 1299.00 1300.00 14
2003-08-01 Perforation 1185.00 1186.00 14
2003-08-02 Remedial Casing Cementing 1299.00 1300.00 0
2003-08-02 Packing Device Capped w/Cement 1269.00 1291.00 0
2003-08-02 Remedial Casing Cementing 1185.00 1186.00 0
2003-08-02 Packing Device Capped w/Cement 1168.00 1178.00 0
2003-08-03 Perforation 676.00 677.00 14
2003-08-03 Remedial Casing Cementing 676.00 677.00 0
1973-09-23 Perforation 2658.50 2664.00 3
2003-08-03 Packing Device Capped w/Cement 643.50 668.50 0
1973-09-23 Perforation 2668.20 2672.50 3
1973-09-23 Perforation 2683.50 2688.90 3
1973-09-23 Perforation 2698.70 2703.60 3
1973-10-10 Acid Treatment 2658.50 2731.00 0
1973-10-11 Alchohol Squeeze 2658.50 2731.00 0
1973-10-12 Acid Treatment 2658.50 2731.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2941 0.0 0.0 0.0
1991 7473 0.0 0.0 0.0
1992 7398 0.0 0.0 0.0
1993 1445 0.0 0.0 0.0
1994 424 0.0 0.0 0.0
1995 249 0.0 0.0 0.0
1996 7 0.0 0.0 0.0

For data sources see[5]

References