X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284120208000

Well Details

Well ID: 0284120208000
Loading map...
Location: 00/08-02-028-12W4/0
Location Alias: 00/08-02-28-12 W4M
Location Alias 2: 00/08-02-028-12 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 12
Section: 02
County/Municipality: Special Areas No. 2
Well Name: BCRI ET AL BERRY 8-2-28-12
Operator Name: Fairwest Energy Corporation
License Number: 0091986
License Date: 1981-08-31
License Status: Issued
Spud Date: 1981-10-18
Final Drill Date: 1981-10-23
Well Total Depth: 1095.00 m
Surface Hole Latitude: 51.362562
Surface Hole Longitude: -111.581012

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-08-31 Obtained License
1981-10-23 Finished Drilling
1981-10-23 Well Mode changed to Drilled and Cased
1981-10-24 Drill Stem Test Performed
1981-10-25 Production Casing Operation Performed
1982-06-29 Perforation Treatment Performed - Jet Perforation
1983-03-02 Well Began Production
1983-03-02 Well Fluid changed to Gas
1983-03-02 Well Mode changed to Flowing
1986-01-30 Well Fluid changed to Gas
1986-01-30 Well Mode changed to Suspended
1989-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-01-06 Plug Back Performed
1989-01-06 Well Fluid changed to Gas
1989-01-06 Well Mode changed to Abandoned Zone
1989-01-07 Perforation Treatment Performed - Jet Perforation
1989-01-14 Perforation Treatment Performed - Fractured
1989-01-21 Perforation Treatment Performed - Jet Perforation
1995-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-20 Plug Back Performed
1995-08-20 Well Abandoned
2015-09-29 Well Log Performed
2015-10-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-06-29 Perforation 1034.00 1038.00 13
1989-01-06 Packing Device Capped w/Cement 1016.00 1024.00 0
1989-01-07 Perforation 883.00 890.50 13
1989-01-14 Fracture 883.00 890.50 0
1989-01-21 Perforation 856.50 857.50 13
1995-08-20 Packing Device Capped w/Cement 836.00 844.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 6159 0.0 0.0 0.0
1984 7138 0.0 0.0 0.0
1985 7239 0.0 0.0 0.0
1986 466 0.0 0.0 0.0

For data sources see[5]

References