X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284200613003

Well Details

Well ID: 0284200613003
Loading map...
Location: 00/13-06-028-20W4/3
Location Alias: 00/13-06-28-20 W4M
Location Alias 2: 00/13-06-028-20 W4/03
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 20
Section: 06
County/Municipality: Kneehill County
Well Name: PCP ET AL WAYNE ROSEDALE 13-6-28-20
Operator Name: Lynx Energy ULC
License Number: 0179020
License Date: 1995-07-04
License Status: Suspension
Spud Date: 1995-08-04
Final Drill Date: 1995-08-19
Well Total Depth: 1947.00 m
Surface Hole Latitude: 51.369047
Surface Hole Longitude: -112.822528

For data sources see[1][2]

Well History

Date Event
1995-07-04 Obtained License
1995-08-04 Surface Casing Operation Performed
1995-08-05 Direction Drilling Operation Performed - Deviate
1995-08-10 Plug Back Performed
1995-08-12 Direction Drilling Operation Performed - Deviate
1995-08-19 Finished Drilling
1995-08-19 Well Log Performed
1995-08-19 Well Mode changed to Drilled and Cased
1995-08-22 Well Log Performed
1995-08-23 Production Casing Operation Performed
1995-08-24 Rig Released
1995-11-15 Well Log Performed
1995-11-18 Well Log Performed
1995-11-21 Well Log Performed
1995-11-22 Perforation Treatment Performed - Jet Perforation
1996-10-23 Perforation Treatment Performed - Jet Perforation
1996-10-23 Well Log Performed
1996-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-13 Plug Back Performed
2003-06-14 Well Log Performed
2004-02-29 Well Log Performed
2005-01-10 Perforation Treatment Performed - Jet Perforation
2005-01-10 Well Log Performed
2006-02-02 Well Log Performed
2006-02-03 Perforation Treatment Performed - Jet Perforation
2006-02-03 Well Log Performed
2006-03-15 Perforation Treatment Performed - Fractured
2006-03-16 Well Fluid changed to Gas
2006-03-16 Well Mode changed to Testing
2006-08-29 Well Began Production
2006-08-29 Well Fluid changed to Gas
2006-08-29 Well Mode changed to Pumping
2010-09-01 Well Fluid changed to Gas
2010-09-01 Well Mode changed to Suspended
2012-03-12 Well Fluid changed to Gas
2012-03-12 Well Mode changed to Flowing
2018-06-01 Well Fluid changed to Gas
2018-06-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-08-05 191.00 Deviate (5 - 79 degrees)
1995-08-12 1118.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-22 Perforation 1855.00 1859.00 13
1996-10-23 Perforation 1852.00 1854.00 20
1996-10-24 Acid Treatment 1852.00 1854.00 0
2003-06-13 Packing Device Capped w/Cement 1840.00 1848.00 0
2005-01-10 Perforation 1459.00 1461.00 17
2006-02-03 Perforation 1500.00 1503.00 17
2006-02-03 Perforation 1491.00 1493.00 17
2006-03-15 Fracture 1491.00 1503.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 2640 0.0 0.0 0.0
2007 3756 0.0 0.0 0.0
2008 340 0.0 0.0 0.0
2009 2589 0.0 0.0 0.0
2012 3937 0.0 0.0 0.0
2013 2532 0.0 0.0 0.0
2014 178 0.0 0.0 0.0
2015 66 0.0 0.0 0.0
2016 19 0.0 0.0 0.0

For data sources see[6]

References