If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284202006000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.406766,"lon":-112.785392,"icon":""}]} |
Location: 00/06-20-028-20W4/0 | |
Location Alias: 00/06-20-28-20 W4M | |
Location Alias 2: 00/06-20-028-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 20 | |
Section: 20 | |
County/Municipality: Kneehill County | |
Well Name: TXNE WAYNE 6-20-28-20 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0020967 | |
License Date: 1961-06-23 | |
License Status: Suspension | |
Spud Date: 1961-06-24 | |
Final Drill Date: 1961-07-03 | |
Well Total Depth: 1414.30 m | |
Surface Hole Latitude: 51.406766 | |
Surface Hole Longitude: -112.785392 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1961-06-23 | Obtained License |
1961-06-28 | Drill Stem Test Performed |
1961-06-30 | Drill Stem Test Performed |
1961-07-03 | Finished Drilling |
1961-07-04 | Drill Stem Test Performed |
1961-07-05 | Drill Stem Test Performed |
1961-07-06 | Production Casing Operation Performed |
1961-09-05 | Well Mode changed to Drilled and Cased |
1977-05-10 | Perforation Treatment Performed - Jet Perforation |
1977-09-10 | Well Began Production |
1977-09-10 | Well Fluid changed to Crude Oil |
1977-09-10 | Well Mode changed to Flowing |
1977-10-26 | Perforation Treatment Performed - Fractured |
1990-10-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-10-22 | Plug Back Performed |
1990-10-22 | Well Fluid changed to Crude Oil |
1990-10-22 | Well Mode changed to Abandoned Zone |
1990-10-24 | Perforation Treatment Performed - Jet Perforation |
1993-07-20 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-05-10 | Perforation | 1348.40 | 1352.10 | 7 |
1977-10-26 | Fracture | 1348.40 | 1352.10 | 0 |
1990-10-22 | Packing Device Capped w/Cement | 1331.80 | 1340.00 | 0 |
1990-10-24 | Perforation | 1172.20 | 1179.50 | 14 |
1993-07-20 | Fracture | 1172.20 | 1179.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 442 | 0.0 | 0.0 | 0.0 |
1978 | 5133 | 0.0 | 0.0 | 0.0 |
1979 | 8304 | 0.0 | 0.0 | 0.0 |
1980 | 8515 | 0.0 | 0.0 | 0.0 |
1981 | 6399 | 0.0 | 0.0 | 0.0 |
1982 | 7350 | 0.0 | 0.0 | 0.0 |
1983 | 6290 | 0.0 | 0.0 | 0.0 |
1984 | 6416 | 0.0 | 0.0 | 0.0 |
1985 | 7275 | 0.0 | 0.0 | 0.0 |
1986 | 5941 | 0.0 | 0.0 | 0.0 |
1987 | 6650 | 0.0 | 0.0 | 0.0 |
1988 | 7246 | 0.0 | 0.0 | 0.0 |
1989 | 5478 | 0.0 | 0.0 | 0.0 |
1990 | 4260 | 0.0 | 0.0 | 0.0 |
For data sources see[5]