If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284213306002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.437326,"lon":-112.90283,"icon":""}]} |
| Location: 00/06-33-028-21W4/2 | |
| Location Alias: 00/06-33-28-21 W4M | |
| Location Alias 2: 00/06-33-028-21 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 21 | |
| Section: 33 | |
| County/Municipality: Kneehill County | |
| Well Name: ECA ECOG WAYNE 6-33-28-21 | |
| Operator Name: Lynx Energy ULC | |
| License Number: 0373261 | |
| License Date: 2007-01-29 | |
| License Status: Issued | |
| Spud Date: 2007-02-05 | |
| Final Drill Date: 2007-02-07 | |
| Well Total Depth: 1486.00 m | |
| Surface Hole Latitude: 51.437326 | |
| Surface Hole Longitude: -112.902830 |
| Date | Event |
|---|---|
| 2007-01-29 | Obtained License |
| 2007-02-05 | Surface Casing Operation Performed |
| 2007-02-07 | Finished Drilling |
| 2007-02-07 | Well Log Performed |
| 2007-02-07 | Well Mode changed to Drilled and Cased |
| 2007-02-08 | Production Casing Operation Performed |
| 2007-02-08 | Rig Released |
| 2007-02-18 | Perforation Treatment Performed - Jet Perforation |
| 2007-02-18 | Well Log Performed |
| 2007-02-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-02-24 | Perforation Treatment Performed - Jet Perforation |
| 2007-02-24 | Plug Back Performed |
| 2007-02-24 | Well Log Performed |
| 2007-02-25 | Perforation Treatment Performed - Jet Perforation |
| 2007-02-25 | Well Log Performed |
| 2007-03-04 | Perforation Treatment Performed - Fractured |
| 2007-03-05 | Well Fluid changed to Gas |
| 2007-03-05 | Well Mode changed to Testing |
| 2007-05-11 | Well Began Production |
| 2007-05-11 | Well Fluid changed to Gas |
| 2007-05-11 | Well Mode changed to Flowing |
| 2009-08-13 | Perforation Treatment Performed - Jet Perforation |
| 2009-08-13 | Well Log Performed |
| 2009-08-26 | Perforation Treatment Performed - Fractured |
| 2009-09-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2009-09-16 | Well Mode changed to Flowing |
| 2009-11-06 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2007-02-18 | Perforation | 1399.00 | 1401.50 | 17 |
| 2007-02-25 | Perforation | 543.00 | 546.50 | 13 |
| 2007-03-04 | Fracture | 1217.00 | 1223.50 | 0 |
| 2007-03-04 | Fracture | 615.00 | 617.00 | 0 |
| 2007-03-04 | Fracture | 600.00 | 602.50 | 0 |
| 2007-03-04 | Fracture | 571.50 | 574.00 | 0 |
| 2007-03-04 | Fracture | 559.50 | 562.00 | 0 |
| 2007-03-04 | Fracture | 543.00 | 549.50 | 0 |
| 2009-08-13 | Perforation | 657.40 | 657.90 | 14 |
| 2009-08-13 | Perforation | 655.10 | 655.60 | 14 |
| 2009-08-13 | Perforation | 651.90 | 652.40 | 14 |
| 2007-02-24 | Packing Device Capped w/Cement | 1388.00 | 1396.00 | 0 |
| 2009-08-13 | Perforation | 379.10 | 379.60 | 14 |
| 2009-08-13 | Perforation | 342.20 | 342.70 | 14 |
| 2009-08-13 | Perforation | 325.90 | 326.40 | 14 |
| 2009-08-13 | Perforation | 318.40 | 318.90 | 14 |
| 2009-08-13 | Perforation | 256.40 | 257.40 | 14 |
| 2009-08-13 | Perforation | 254.20 | 254.70 | 14 |
| 2009-08-13 | Perforation | 239.30 | 240.30 | 14 |
| 2009-08-13 | Perforation | 234.20 | 234.70 | 14 |
| 2009-08-13 | Perforation | 225.40 | 226.40 | 14 |
| 2009-08-13 | Perforation | 223.30 | 225.30 | 14 |
| 2007-02-24 | Perforation | 1220.00 | 1223.50 | 13 |
| 2009-08-13 | Perforation | 216.60 | 217.60 | 14 |
| 2009-08-13 | Perforation | 212.40 | 214.40 | 14 |
| 2009-08-13 | Perforation | 211.50 | 212.00 | 14 |
| 2009-08-13 | Perforation | 206.50 | 207.00 | 14 |
| 2009-08-26 | Fracture | 206.50 | 657.90 | 0 |
| 2007-02-24 | Perforation | 1217.00 | 1220.00 | 13 |
| 2007-02-24 | Perforation | 615.00 | 617.00 | 13 |
| 2007-02-24 | Perforation | 600.00 | 602.50 | 13 |
| 2007-02-24 | Perforation | 571.50 | 574.00 | 13 |
| 2007-02-24 | Perforation | 559.50 | 562.00 | 13 |
| 2007-02-24 | Perforation | 546.50 | 549.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2007 | 4907 | 0.0 | 0.0 | 0.0 |
| 2008 | 7901 | 0.0 | 0.0 | 0.0 |
| 2009 | 6178 | 0.0 | 0.0 | 0.0 |
| 2010 | 1182 | 0.0 | 0.0 | 0.0 |
| 2011 | 1665 | 0.0 | 0.0 | 0.0 |
| 2012 | 5949 | 0.0 | 0.0 | 0.0 |
| 2013 | 6994 | 0.0 | 0.0 | 0.0 |
| 2014 | 8020 | 0.0 | 0.0 | 0.0 |
| 2015 | 8246 | 0.0 | 0.0 | 0.0 |
| 2016 | 7746 | 0.0 | 0.0 | 0.0 |
| 2017 | 8626 | 0.0 | 0.0 | 0.0 |
| 2018 | 8750 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]