X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284221606002

Well Details

Well ID: 0284221606002
Loading map...
Location: 00/06-16-028-22W4/2
Location Alias: 00/06-16-28-22 W4M
Location Alias 2: 00/06-16-028-22 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 22
Section: 16
County/Municipality: Kneehill County
Well Name: PCP WAYNE 6-16-28-22
Operator Name: Lynx Energy ULC
License Number: 0165385
License Date: 1994-02-24
License Status: Issued
Spud Date: 1994-09-09
Final Drill Date: 1994-09-15
Well Total Depth: 1568.00 m
Surface Hole Latitude: 51.390963
Surface Hole Longitude: -113.045892

For data sources see[1][2]

Well History

Date Event
1994-02-24 Obtained License
1994-09-10 Surface Casing Operation Performed
1994-09-15 Finished Drilling
1994-09-15 Well Mode changed to Drilled and Cased
1994-09-16 Well Log Performed
1994-09-17 Drill Stem Test Performed
1994-09-18 Production Casing Operation Performed
1994-09-18 Rig Released
1994-10-21 Well Log Performed
1994-10-22 Perforation Treatment Performed - Jet Perforation
1994-10-27 Perforation Treatment Performed - Fractured
1994-10-29 Well Log Performed
1994-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-30 Plug Back Performed
1994-10-30 Well Log Performed
1994-10-31 Perforation Treatment Performed - Jet Perforation
1994-11-03 Perforation Treatment Performed - Fractured
2006-01-07 Perforation Treatment Performed - Jet Perforation
2006-01-07 Well Log Performed
2006-01-27 Perforation Treatment Performed - Fractured
2006-02-02 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-10-22 Perforation 1278.50 1281.00 20
2006-01-07 Perforation 595.70 596.70 13
2006-01-07 Perforation 592.70 593.70 13
2006-01-07 Perforation 450.10 451.10 13
2006-01-07 Perforation 438.10 439.10 13
2006-01-07 Perforation 433.80 434.80 13
2006-01-07 Perforation 431.20 432.20 13
2006-01-07 Perforation 392.90 393.90 13
2006-01-07 Perforation 370.20 371.20 13
2006-01-07 Perforation 364.30 365.30 13
2006-01-07 Perforation 354.90 355.90 13
1994-10-22 Perforation 1284.50 1285.50 20
2006-01-07 Perforation 309.10 310.10 13
2006-01-07 Perforation 303.70 304.70 13
2006-01-07 Perforation 289.90 290.90 13
2006-01-07 Perforation 285.60 286.60 13
2006-01-07 Perforation 274.40 275.40 13
2006-01-07 Perforation 272.10 273.10 13
2006-01-07 Perforation 265.00 266.00 13
2006-01-07 Perforation 232.50 233.50 13
2006-01-07 Perforation 212.00 213.00 13
2006-01-27 Fracture 212.00 716.60 0
1994-10-27 Fracture 1278.50 1285.50 0
1994-10-30 Packing Device Capped w/Cement 1262.00 1270.00 0
1994-10-31 Perforation 717.00 721.00 14
1994-11-03 Fracture 717.00 721.00 0
2006-01-07 Perforation 715.60 716.60 13
2006-01-07 Perforation 712.20 713.20 13
2006-01-07 Perforation 705.40 706.40 13

For data sources see[4]



References