If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284231905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.40693,"lon":-113.234406,"icon":""}]} |
| Location: 00/05-19-028-23W4/0 | |
| Location Alias: 00/05-19-28-23 W4M | |
| Location Alias 2: 00/05-19-028-23 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 23 | |
| Section: 19 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER ENTICE 5-19-28-23 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0410291 | |
| License Date: 2009-04-30 | |
| License Status: Issued | |
| Spud Date: 2010-01-10 | |
| Final Drill Date: 2010-01-21 | |
| Well Total Depth: 652.00 m | |
| Surface Hole Latitude: 51.406930 | |
| Surface Hole Longitude: -113.234406 |
| Date | Event |
|---|---|
| 2009-04-30 | Obtained License |
| 2010-01-10 | Surface Casing Operation Performed |
| 2010-01-21 | Finished Drilling |
| 2010-01-21 | Production Casing Operation Performed |
| 2010-01-21 | Rig Released |
| 2010-01-21 | Well Mode changed to Drilled and Cased |
| 2010-01-29 | Well Log Performed |
| 2010-02-24 | Perforation Treatment Performed - Jet Perforation |
| 2010-10-24 | Perforation Treatment Performed - Fractured |
| 2010-10-30 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-10-30 | Well Mode changed to Testing |
| 2010-11-09 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-15 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-20 | Perforation Treatment Performed - Fractured |
| 2010-12-13 | Well Began Production |
| 2010-12-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-12-13 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-02-24 | Perforation | 611.00 | 613.00 | 13 |
| 2010-11-09 | Perforation | 480.20 | 480.70 | 13 |
| 2010-11-09 | Perforation | 446.70 | 447.70 | 13 |
| 2010-11-09 | Perforation | 441.40 | 441.90 | 13 |
| 2010-11-09 | Perforation | 437.70 | 438.70 | 13 |
| 2010-11-09 | Perforation | 436.30 | 436.80 | 13 |
| 2010-11-09 | Perforation | 432.90 | 433.40 | 13 |
| 2010-11-09 | Perforation | 431.00 | 432.00 | 13 |
| 2010-11-09 | Perforation | 428.80 | 429.30 | 13 |
| 2010-11-09 | Perforation | 404.80 | 405.30 | 13 |
| 2010-11-09 | Perforation | 401.10 | 401.60 | 13 |
| 2010-10-24 | Fracture | 611.00 | 613.00 | 0 |
| 2010-11-09 | Perforation | 386.30 | 386.80 | 13 |
| 2010-11-09 | Perforation | 382.00 | 382.50 | 13 |
| 2010-11-09 | Perforation | 371.70 | 372.70 | 13 |
| 2010-11-09 | Perforation | 361.00 | 361.50 | 13 |
| 2010-11-09 | Perforation | 328.30 | 328.80 | 13 |
| 2010-11-09 | Perforation | 277.60 | 278.10 | 13 |
| 2010-11-09 | Perforation | 263.60 | 264.10 | 13 |
| 2010-11-09 | Perforation | 526.00 | 528.00 | 13 |
| 2010-11-09 | Perforation | 451.00 | 454.00 | 13 |
| 2010-11-09 | Perforation | 417.00 | 418.00 | 13 |
| 2010-11-09 | Perforation | 553.40 | 553.90 | 13 |
| 2010-11-09 | Perforation | 413.00 | 414.00 | 13 |
| 2010-11-09 | Perforation | 377.00 | 380.00 | 13 |
| 2010-11-09 | Perforation | 367.00 | 369.00 | 13 |
| 2010-11-09 | Perforation | 354.00 | 357.00 | 13 |
| 2010-11-09 | Perforation | 306.00 | 309.00 | 13 |
| 2010-11-09 | Perforation | 301.50 | 303.50 | 13 |
| 2010-11-09 | Perforation | 293.50 | 294.50 | 13 |
| 2010-11-09 | Perforation | 275.00 | 277.00 | 13 |
| 2010-11-09 | Perforation | 271.00 | 272.00 | 13 |
| 2010-11-09 | Perforation | 252.50 | 254.50 | 13 |
| 2010-11-09 | Perforation | 552.00 | 552.50 | 13 |
| 2010-11-09 | Perforation | 238.00 | 240.00 | 13 |
| 2010-11-15 | Perforation | 210.00 | 213.00 | 13 |
| 2010-11-15 | Perforation | 196.00 | 198.00 | 13 |
| 2010-11-15 | Perforation | 177.00 | 179.00 | 13 |
| 2010-11-15 | Perforation | 218.00 | 219.00 | 13 |
| 2010-11-15 | Perforation | 203.20 | 203.70 | 13 |
| 2010-11-15 | Perforation | 230.00 | 233.00 | 13 |
| 2010-11-20 | Fracture | 210.00 | 528.00 | 0 |
| 2010-11-20 | Fracture | 263.60 | 553.90 | 0 |
| 2010-11-09 | Perforation | 518.80 | 519.30 | 13 |
| 2010-11-09 | Perforation | 510.20 | 510.70 | 13 |
| 2010-11-09 | Perforation | 500.10 | 500.60 | 13 |
| 2010-11-09 | Perforation | 493.00 | 494.00 | 13 |
| 2010-11-09 | Perforation | 488.70 | 489.20 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 460 | 0.0 | 0.0 | 0.0 |
| 2011 | 8727 | 0.0 | 0.0 | 0.0 |
| 2012 | 8548 | 0.0 | 0.0 | 0.0 |
| 2013 | 8331 | 0.0 | 0.0 | 0.0 |
| 2014 | 8664 | 0.0 | 0.0 | 0.0 |
| 2015 | 8621 | 0.0 | 0.0 | 0.0 |
| 2016 | 8649 | 0.0 | 0.0 | 0.0 |
| 2017 | 8572 | 0.0 | 0.0 | 0.0 |
| 2018 | 8666 | 0.0 | 0.0 | 0.0 |
| 2019 | 8642 | 0.0 | 0.0 | 0.0 |
| 2020 | 2176 | 0.0 | 0.0 | 0.0 |
For data sources see[5]