X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284231906002

Well Details

Well ID: 0284231906002
Loading map...
Location: 00/06-19-028-23W4/2
Location Alias: 00/06-19-28-23 W4M
Location Alias 2: 00/06-19-028-23 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 23
Section: 19
County/Municipality: Kneehill County
Well Name: EMBER ENTICE 6-19-28-23
Operator Name: Ember Resources Inc.
License Number: 0324772
License Date: 2005-01-21
License Status: Issued
Spud Date: 2005-02-10
Final Drill Date: 2005-02-11
Well Total Depth: 930.00 m
Surface Hole Latitude: 51.405357
Surface Hole Longitude: -113.228726

For data sources see[1][2]

Well History

Date Event
2005-01-21 Obtained License
2005-02-10 Surface Casing Operation Performed
2005-02-11 Finished Drilling
2005-02-11 Well Mode changed to Drilled and Cased
2005-02-12 Production Casing Operation Performed
2005-02-12 Rig Released
2005-02-16 Well Log Performed
2005-03-01 Perforation Treatment Performed - Jet Perforation
2008-10-22 Perforation Treatment Performed - Jet Perforation
2008-11-09 Perforation Treatment Performed - Fractured
2008-11-14 Well Fluid changed to Gas
2008-11-14 Well Mode changed to Testing
2008-11-19 Perforation Treatment Performed - Jet Perforation
2008-11-29 Perforation Treatment Performed - Jet Perforation
2008-12-03 Perforation Treatment Performed - Fractured
2008-12-08 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-03-01 Perforation 623.00 625.00 13
2008-11-29 Perforation 402.90 403.40 13
2008-11-29 Perforation 395.20 395.70 13
2008-11-29 Perforation 399.80 400.30 13
2008-11-29 Perforation 268.90 269.40 13
2008-11-29 Perforation 278.10 278.60 13
2008-11-29 Perforation 361.00 363.00 13
2008-11-29 Perforation 265.50 266.00 13
2008-11-29 Perforation 358.80 359.30 13
2008-11-29 Perforation 370.20 371.20 13
2008-11-29 Perforation 288.40 288.90 13
2008-10-22 Perforation 474.00 477.00 13
2008-11-29 Perforation 325.50 326.00 13
2008-11-29 Perforation 424.40 424.90 13
2008-11-29 Perforation 510.50 511.50 13
2008-11-29 Perforation 518.00 518.50 13
2008-11-29 Perforation 494.00 495.00 13
2008-11-29 Perforation 501.40 502.40 13
2008-11-29 Perforation 554.50 555.00 13
2008-11-29 Perforation 561.80 562.30 13
2008-11-29 Perforation 519.90 520.40 13
2008-11-29 Perforation 553.30 553.80 13
2008-11-09 Fracture 474.00 477.00 0
2008-11-29 Perforation 432.80 433.30 13
2008-11-29 Perforation 433.90 434.90 13
2008-11-29 Perforation 426.80 427.80 13
2008-11-29 Perforation 428.80 429.30 13
2008-11-29 Perforation 480.00 480.50 13
2008-11-29 Perforation 489.10 489.60 13
2008-11-29 Perforation 445.10 445.60 13
2008-11-29 Perforation 445.90 447.90 13
2008-12-03 Fracture 361.00 363.00 0
2008-12-03 Fracture 265.50 562.30 0
2008-11-19 Perforation 437.00 440.00 13
2008-11-29 Perforation 384.80 385.30 13
2008-11-29 Perforation 392.20 392.70 13
2008-11-29 Perforation 373.60 374.10 13
2008-11-29 Perforation 380.30 380.80 13
2008-11-29 Perforation 401.50 402.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 24 0.0 0.0 0.0

For data sources see[5]

References