X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284241801000

Well Details

Well ID: 0284241801000
Loading map...
Location: 00/01-18-028-24W4/0
Location Alias: 00/01-18-28-24 W4M
Location Alias 2: 00/01-18-028-24 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 24
Section: 18
County/Municipality: Kneehill County
Well Name: EMBER ENTICE 1-18-28-24
Operator Name: Ember Resources Inc.
License Number: 0218407
License Date: 1998-11-02
License Status: Issued
Spud Date: 1998-11-18
Final Drill Date: 1998-11-19
Well Total Depth: 950.00 m
Surface Hole Latitude: 51.388641
Surface Hole Longitude: -113.357746

For data sources see[1][2]

Well History

Date Event
1998-11-02 Obtained License
1998-11-19 Finished Drilling
1998-11-19 Production Casing Operation Performed
1998-11-19 Rig Released
1998-11-26 Well Log Performed
1999-01-22 Well Mode changed to Drilled and Cased
2003-06-14 Perforation Treatment Performed - Jet Perforation
2003-07-11 Perforation Treatment Performed - Fractured
2003-08-10 Well Began Production
2003-08-10 Well Fluid changed to Gas
2003-08-10 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-06-14 Perforation 675.00 677.00 13
2003-06-14 Perforation 489.60 490.60 13
2003-06-14 Perforation 482.00 483.00 13
2003-06-14 Perforation 478.00 480.00 13
2003-06-14 Perforation 476.00 478.00 13
2003-06-14 Perforation 453.00 456.00 13
2003-06-14 Perforation 447.20 448.20 13
2003-06-14 Perforation 445.30 446.30 13
2003-06-14 Perforation 437.20 438.20 13
2003-06-14 Perforation 434.10 435.10 13
2003-06-14 Perforation 431.10 433.10 13
2003-06-14 Perforation 553.10 554.10 13
2003-06-14 Perforation 429.30 430.30 13
2003-06-14 Perforation 409.50 410.50 13
2003-06-14 Perforation 406.90 407.90 13
2003-06-14 Perforation 400.80 401.80 13
2003-06-14 Perforation 393.80 394.80 13
2003-06-14 Perforation 388.00 389.00 13
2003-06-14 Perforation 383.10 386.10 13
2003-06-14 Perforation 371.30 372.30 13
2003-06-14 Perforation 341.90 342.90 13
2003-06-14 Perforation 325.00 327.00 13
2003-06-14 Perforation 551.20 552.20 13
2003-06-14 Perforation 284.50 285.50 13
2003-06-14 Perforation 278.30 279.30 13
2003-06-14 Perforation 270.50 271.50 13
2003-06-14 Perforation 267.60 268.60 13
2003-06-14 Perforation 202.70 203.70 13
2003-07-11 Fracture 202.70 677.00 0
2003-06-14 Perforation 533.60 534.60 13
2003-06-14 Perforation 521.70 522.70 13
2003-06-14 Perforation 514.80 515.80 13
2003-06-14 Perforation 510.60 511.60 13
2003-06-14 Perforation 503.60 504.60 13
2003-06-14 Perforation 495.50 496.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 3360 0.0 0.0 0.0
2004 8693 0.0 0.0 0.0
2005 8585 0.0 0.0 0.0
2006 8596 0.0 0.0 0.0
2007 7623 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8750 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8570 0.0 0.0 0.0
2013 8611 0.0 0.0 0.0
2014 8645 0.0 0.0 0.0
2015 8722 0.0 0.0 0.0
2016 8684 0.0 0.0 0.0
2017 8649 0.0 0.0 0.0
2018 8688 0.0 0.0 0.0
2019 8673 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[5]

References