X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284242804000

Well Details

Well ID: 0284242804000
Loading map...
Location: 00/04-28-028-24W4/0
Location Alias: 00/04-28-28-24 W4M
Location Alias 2: 00/04-28-028-24 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 24
Section: 28
County/Municipality: Kneehill County
Well Name: EMBER ENTICE 4-28-28-24
Operator Name: Ember Resources Inc.
License Number: 0324108
License Date: 2005-01-13
License Status: Issued
Spud Date: 2005-05-24
Final Drill Date: 2005-07-16
Well Total Depth: 703.00 m
Surface Hole Latitude: 51.418770
Surface Hole Longitude: -113.330476

For data sources see[1][2]

Well History

Date Event
2005-01-13 Obtained License
2005-05-24 Surface Casing Operation Performed
2005-07-16 Finished Drilling
2005-07-16 Production Casing Operation Performed
2005-07-16 Rig Released
2005-07-16 Well Log Performed
2005-07-16 Well Mode changed to Drilled and Cased
2005-07-20 Well Log Performed
2005-09-01 Perforation Treatment Performed - Jet Perforation
2005-09-23 Well Fluid changed to Gas
2005-09-23 Well Mode changed to Testing
2005-11-05 Perforation Treatment Performed - Jet Perforation
2005-11-28 Perforation Treatment Performed - Fractured
2008-11-19 Well Began Production
2008-11-19 Well Fluid changed to Coalbed Methane-Coals and Other
2008-11-19 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-01 Perforation 657.00 658.00 13
2005-11-05 Perforation 533.10 533.60 13
2005-11-05 Perforation 526.40 526.90 13
2005-11-05 Perforation 521.20 521.70 13
2005-11-05 Perforation 514.00 514.50 13
2005-11-05 Perforation 483.00 483.50 13
2005-11-05 Perforation 471.10 471.60 13
2005-11-05 Perforation 466.90 467.40 13
2005-11-05 Perforation 463.00 463.50 13
2005-11-05 Perforation 460.90 461.40 13
2005-11-05 Perforation 436.90 437.40 13
2005-11-05 Perforation 588.40 588.90 13
2005-11-05 Perforation 434.20 435.20 13
2005-11-05 Perforation 430.50 431.00 13
2005-11-05 Perforation 428.90 429.40 13
2005-11-05 Perforation 420.40 420.90 13
2005-11-05 Perforation 416.00 416.50 13
2005-11-05 Perforation 411.30 411.80 13
2005-11-05 Perforation 399.30 399.80 13
2005-11-05 Perforation 374.50 375.00 13
2005-11-05 Perforation 373.60 374.10 13
2005-11-05 Perforation 363.50 364.00 13
2005-11-05 Perforation 586.70 587.20 13
2005-11-05 Perforation 356.20 356.70 13
2005-11-05 Perforation 313.40 313.90 13
2005-11-05 Perforation 300.10 300.60 13
2005-11-05 Perforation 289.20 289.70 13
2005-11-05 Perforation 239.00 239.50 13
2005-11-05 Perforation 197.80 198.30 13
2005-11-28 Fracture 197.80 588.90 0
2005-11-05 Perforation 568.20 568.70 13
2005-11-05 Perforation 567.00 567.50 13
2005-11-05 Perforation 557.20 557.70 13
2005-11-05 Perforation 550.40 550.90 13
2005-11-05 Perforation 544.40 544.90 13
2005-11-05 Perforation 534.20 534.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 1032 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8750 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8570 0.0 0.0 0.0
2013 8609 0.0 0.0 0.0
2014 8645 0.0 0.0 0.0
2015 8722 0.0 0.0 0.0
2016 8684 0.0 0.0 0.0
2017 8315 0.0 0.0 0.0
2018 8688 0.0 0.0 0.0
2019 8673 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[5]

References