If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284243006000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.422916,"lon":-113.369286,"icon":""}]} |
Location: 00/06-30-028-24W4/0 | |
Location Alias: 00/06-30-28-24 W4M | |
Location Alias 2: 00/06-30-028-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 24 | |
Section: 30 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ENTICE 6-30-28-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0272168 | |
License Date: 2002-07-26 | |
License Status: Issued | |
Spud Date: 2002-08-12 | |
Final Drill Date: 2002-08-24 | |
Well Total Depth: 979.00 m | |
Surface Hole Latitude: 51.422916 | |
Surface Hole Longitude: -113.369286 |
Date | Event |
---|---|
2002-07-26 | Obtained License |
2002-08-12 | Surface Casing Operation Performed |
2002-08-24 | Finished Drilling |
2002-08-24 | Production Casing Operation Performed |
2002-08-24 | Rig Released |
2002-08-24 | Well Mode changed to Drilled and Cased |
2002-09-03 | Well Log Performed |
2002-09-10 | Well Log Performed |
2002-09-16 | Perforation Treatment Performed - Fractured |
2002-09-16 | Perforation Treatment Performed - Jet Perforation |
2002-12-05 | Perforation Treatment Performed - Jet Perforation |
2003-01-28 | Perforation Treatment Performed - Jet Perforation |
2003-05-17 | Perforation Treatment Performed - Jet Perforation |
2003-07-01 | Perforation Treatment Performed - Jet Perforation |
2003-07-17 | Perforation Treatment Performed - Fractured |
2003-08-21 | Well Began Production |
2003-08-21 | Well Fluid changed to Gas |
2003-08-21 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-09-16 | Perforation | 658.00 | 660.00 | 13 |
2003-05-17 | Perforation | 403.00 | 408.00 | 13 |
2003-07-01 | Perforation | 595.20 | 596.20 | 13 |
2003-07-01 | Perforation | 589.40 | 590.40 | 13 |
2003-07-01 | Perforation | 587.20 | 588.20 | 13 |
2003-07-01 | Perforation | 568.70 | 569.70 | 13 |
2003-07-01 | Perforation | 560.70 | 561.70 | 13 |
2003-07-01 | Perforation | 551.90 | 552.90 | 13 |
2003-07-01 | Perforation | 546.10 | 547.10 | 13 |
2003-07-01 | Perforation | 538.80 | 539.80 | 13 |
2003-07-01 | Perforation | 531.50 | 532.50 | 13 |
2002-09-16 | Perforation | 648.00 | 650.00 | 13 |
2003-07-01 | Perforation | 527.70 | 528.70 | 13 |
2003-07-01 | Perforation | 520.40 | 521.40 | 13 |
2003-07-01 | Perforation | 490.20 | 491.20 | 13 |
2003-07-01 | Perforation | 485.60 | 486.60 | 13 |
2003-07-01 | Perforation | 475.70 | 476.70 | 13 |
2003-07-01 | Perforation | 469.60 | 470.60 | 13 |
2003-07-01 | Perforation | 465.80 | 467.80 | 13 |
2003-07-01 | Perforation | 464.30 | 465.30 | 13 |
2003-07-01 | Perforation | 449.10 | 450.10 | 13 |
2003-07-01 | Perforation | 439.70 | 440.70 | 13 |
2002-09-16 | Perforation | 642.00 | 645.00 | 13 |
2003-07-01 | Perforation | 434.40 | 435.40 | 13 |
2003-07-01 | Perforation | 430.90 | 431.90 | 13 |
2003-07-01 | Perforation | 423.00 | 424.00 | 13 |
2003-07-01 | Perforation | 417.70 | 418.70 | 13 |
2003-07-01 | Perforation | 413.00 | 415.00 | 13 |
2003-07-01 | Perforation | 410.70 | 411.70 | 13 |
2003-07-01 | Perforation | 399.70 | 400.70 | 13 |
2003-07-01 | Perforation | 397.60 | 398.60 | 13 |
2003-07-01 | Perforation | 362.80 | 363.80 | 13 |
2003-07-01 | Perforation | 322.60 | 323.60 | 13 |
2002-09-16 | Fracture | 642.00 | 660.00 | 0 |
2003-07-01 | Perforation | 317.30 | 318.30 | 13 |
2003-07-01 | Perforation | 311.90 | 312.90 | 13 |
2003-07-01 | Perforation | 289.40 | 290.40 | 13 |
2003-07-01 | Perforation | 236.60 | 237.60 | 13 |
2003-07-01 | Perforation | 197.60 | 198.60 | 13 |
2003-07-01 | Perforation | 193.80 | 194.80 | 13 |
2003-07-17 | Fracture | 193.80 | 596.20 | 0 |
2002-12-05 | Perforation | 494.00 | 496.00 | 13 |
2002-12-05 | Perforation | 492.00 | 494.00 | 13 |
2003-01-28 | Perforation | 460.00 | 463.00 | 13 |
2003-01-28 | Perforation | 456.00 | 459.00 | 13 |
2003-01-28 | Perforation | 451.00 | 454.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 3121 | 0.0 | 0.0 | 0.0 |
2004 | 7998 | 0.0 | 0.0 | 0.0 |
2005 | 8585 | 0.0 | 0.0 | 0.0 |
2006 | 8596 | 0.0 | 0.0 | 0.0 |
2007 | 7623 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8740 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8570 | 0.0 | 0.0 | 0.0 |
2013 | 8611 | 0.0 | 0.0 | 0.0 |
2014 | 8645 | 0.0 | 0.0 | 0.0 |
2015 | 8722 | 0.0 | 0.0 | 0.0 |
2016 | 8685 | 0.0 | 0.0 | 0.0 |
2017 | 8649 | 0.0 | 0.0 | 0.0 |
2018 | 8688 | 0.0 | 0.0 | 0.0 |
2019 | 8673 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[5]