If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284243115000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.444684,"lon":-113.363599,"icon":""}]} |
Location: 00/15-31-028-24W4/0 | |
Location Alias: 00/15-31-28-24 W4M | |
Location Alias 2: 00/15-31-028-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 24 | |
Section: 31 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ENTICE 15-31-28-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0328093 | |
License Date: 2005-03-15 | |
License Status: Issued | |
Spud Date: 2005-05-23 | |
Final Drill Date: 2005-07-03 | |
Well Total Depth: 948.00 m | |
Surface Hole Latitude: 51.444684 | |
Surface Hole Longitude: -113.363599 |
Date | Event |
---|---|
2005-03-15 | Obtained License |
2005-05-23 | Surface Casing Operation Performed |
2005-07-03 | Finished Drilling |
2005-07-03 | Production Casing Operation Performed |
2005-07-03 | Rig Released |
2005-07-03 | Well Mode changed to Drilled and Cased |
2005-07-06 | Well Log Performed |
2005-07-31 | Perforation Treatment Performed - Jet Perforation |
2005-08-03 | Perforation Treatment Performed - Fractured |
2005-08-25 | Well Began Production |
2005-08-25 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-08-25 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-07-31 | Perforation | 848.60 | 849.10 | 13 |
2005-07-31 | Perforation | 541.70 | 542.20 | 13 |
2005-07-31 | Perforation | 534.20 | 534.70 | 13 |
2005-07-31 | Perforation | 529.70 | 530.20 | 13 |
2005-07-31 | Perforation | 528.80 | 529.30 | 13 |
2005-07-31 | Perforation | 521.00 | 521.50 | 13 |
2005-07-31 | Perforation | 510.30 | 510.80 | 13 |
2005-07-31 | Perforation | 506.50 | 507.00 | 13 |
2005-07-31 | Perforation | 498.30 | 498.80 | 13 |
2005-07-31 | Perforation | 493.60 | 494.10 | 13 |
2005-07-31 | Perforation | 492.40 | 492.90 | 13 |
2005-07-31 | Perforation | 710.50 | 711.00 | 13 |
2005-07-31 | Perforation | 466.80 | 467.30 | 13 |
2005-07-31 | Perforation | 465.50 | 466.00 | 13 |
2005-07-31 | Perforation | 461.30 | 461.80 | 13 |
2005-07-31 | Perforation | 454.20 | 454.70 | 13 |
2005-07-31 | Perforation | 449.10 | 449.60 | 13 |
2005-07-31 | Perforation | 445.70 | 446.20 | 13 |
2005-07-31 | Perforation | 432.20 | 432.70 | 13 |
2005-07-31 | Perforation | 422.20 | 422.70 | 13 |
2005-07-31 | Perforation | 419.90 | 420.40 | 13 |
2005-07-31 | Perforation | 412.50 | 413.00 | 13 |
2005-07-31 | Perforation | 697.50 | 698.00 | 13 |
2005-07-31 | Perforation | 410.70 | 411.20 | 13 |
2005-07-31 | Perforation | 402.70 | 403.20 | 13 |
2005-07-31 | Perforation | 394.00 | 394.50 | 13 |
2005-07-31 | Perforation | 391.80 | 392.30 | 13 |
2005-07-31 | Perforation | 353.20 | 353.70 | 13 |
2005-07-31 | Perforation | 340.60 | 341.10 | 13 |
2005-07-31 | Perforation | 323.00 | 323.50 | 13 |
2005-07-31 | Perforation | 292.40 | 292.90 | 13 |
2005-07-31 | Perforation | 280.30 | 280.80 | 13 |
2005-07-31 | Perforation | 274.60 | 275.10 | 13 |
2005-07-31 | Perforation | 687.40 | 687.90 | 13 |
2005-07-31 | Perforation | 269.50 | 270.00 | 13 |
2005-07-31 | Perforation | 220.00 | 220.50 | 13 |
2005-07-31 | Perforation | 181.90 | 182.40 | 13 |
2005-07-31 | Perforation | 179.00 | 179.50 | 13 |
2005-07-31 | Perforation | 176.70 | 177.20 | 13 |
2005-08-03 | Fracture | 176.70 | 849.10 | 0 |
2005-07-31 | Perforation | 570.50 | 571.00 | 13 |
2005-07-31 | Perforation | 568.70 | 569.20 | 13 |
2005-07-31 | Perforation | 567.40 | 567.90 | 13 |
2005-07-31 | Perforation | 565.50 | 566.00 | 13 |
2005-07-31 | Perforation | 548.40 | 548.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 2939 | 0.0 | 0.0 | 0.0 |
2006 | 8596 | 0.0 | 0.0 | 0.0 |
2007 | 7623 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8750 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8570 | 0.0 | 0.0 | 0.0 |
2013 | 8611 | 0.0 | 0.0 | 0.0 |
2014 | 8645 | 0.0 | 0.0 | 0.0 |
2015 | 8722 | 0.0 | 0.0 | 0.0 |
2016 | 8684 | 0.0 | 0.0 | 0.0 |
2017 | 8649 | 0.0 | 0.0 | 0.0 |
2018 | 8688 | 0.0 | 0.0 | 0.0 |
2019 | 8673 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[5]