X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284243210000

Well Details

Well ID: 0284243210000
Loading map...
Location: 00/10-32-028-24W4/0
Location Alias: 00/10-32-28-24 W4M
Location Alias 2: 00/10-32-028-24 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 24
Section: 32
County/Municipality: Kneehill County
Well Name: EMBER ENTICE 10-32-28-24
Operator Name: Ember Resources Inc.
License Number: 0328112
License Date: 2005-03-15
License Status: Issued
Spud Date: 2005-05-22
Final Drill Date: 2005-06-30
Well Total Depth: 947.00 m
Surface Hole Latitude: 51.438276
Surface Hole Longitude: -113.344607

For data sources see[1][2]

Well History

Date Event
2005-03-15 Obtained License
2005-05-22 Surface Casing Operation Performed
2005-06-30 Finished Drilling
2005-06-30 Production Casing Operation Performed
2005-06-30 Rig Released
2005-06-30 Well Mode changed to Drilled and Cased
2005-07-05 Well Log Performed
2005-07-18 Perforation Treatment Performed - Jet Perforation
2005-09-01 Perforation Treatment Performed - Jet Perforation
2005-09-07 Perforation Treatment Performed - Fractured
2005-09-20 Well Began Production
2005-09-20 Well Fluid changed to Coalbed Methane-Coals and Other
2005-09-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-18 Perforation 717.00 721.00 13
2005-09-01 Perforation 511.20 511.70 13
2005-09-01 Perforation 507.00 507.50 13
2005-09-01 Perforation 498.40 498.90 13
2005-09-01 Perforation 493.20 493.70 13
2005-09-01 Perforation 467.90 468.40 13
2005-09-01 Perforation 461.10 461.60 13
2005-09-01 Perforation 459.20 459.70 13
2005-09-01 Perforation 449.90 450.40 13
2005-09-01 Perforation 449.00 449.50 13
2005-09-01 Perforation 447.60 448.10 13
2005-09-01 Perforation 568.40 568.90 13
2005-09-01 Perforation 422.10 422.60 13
2005-09-01 Perforation 412.30 412.80 13
2005-09-01 Perforation 400.80 401.30 13
2005-09-01 Perforation 392.20 392.70 13
2005-09-01 Perforation 390.40 390.90 13
2005-09-01 Perforation 386.80 387.30 13
2005-09-01 Perforation 362.00 362.50 13
2005-09-01 Perforation 354.50 355.00 13
2005-09-01 Perforation 341.50 342.00 13
2005-09-01 Perforation 291.70 292.20 13
2005-09-01 Perforation 567.10 567.60 13
2005-09-01 Perforation 218.70 219.20 13
2005-09-01 Perforation 177.30 177.80 13
2005-09-07 Fracture 177.30 568.90 0
2005-09-01 Perforation 565.40 565.90 13
2005-09-01 Perforation 547.70 548.20 13
2005-09-01 Perforation 540.50 541.00 13
2005-09-01 Perforation 533.40 533.90 13
2005-09-01 Perforation 527.10 527.60 13
2005-09-01 Perforation 519.80 520.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 2441 0.0 0.0 0.0
2006 8596 0.0 0.0 0.0
2007 7623 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8740 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8570 0.0 0.0 0.0
2013 8611 0.0 0.0 0.0
2014 8644 0.0 0.0 0.0
2015 8722 0.0 0.0 0.0
2016 8684 0.0 0.0 0.0
2017 8649 0.0 0.0 0.0
2018 8688 0.0 0.0 0.0
2019 8673 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[5]

References