If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284250909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.380066,"lon":-113.451585,"icon":""}]} |
| Location: 00/09-09-028-25W4/0 | |
| Location Alias: 00/09-09-28-25 W4M | |
| Location Alias 2: 00/09-09-028-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 09 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 9-9-28-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0199690 | |
| License Date: 1997-03-21 | |
| License Status: Issued | |
| Spud Date: 1997-05-27 | |
| Final Drill Date: 1997-07-09 | |
| Well Total Depth: 1012.00 m | |
| Surface Hole Latitude: 51.380066 | |
| Surface Hole Longitude: -113.451585 |
| Date | Event |
|---|---|
| 1997-03-21 | Obtained License |
| 1997-05-27 | Surface Casing Operation Performed |
| 1997-07-09 | Finished Drilling |
| 1997-07-10 | Production Casing Operation Performed |
| 1997-07-10 | Rig Released |
| 1997-07-10 | Well Mode changed to Drilled and Cased |
| 1997-08-01 | Well Log Performed |
| 1998-11-14 | Perforation Treatment Performed - Jet Perforation |
| 1998-11-24 | Perforation Treatment Performed - Fractured |
| 1998-12-13 | Perforation Treatment Performed - Jet Perforation |
| 2000-02-24 | Perforation Treatment Performed - Jet Perforation |
| 2000-03-21 | Perforation Treatment Performed - Jet Perforation |
| 2001-11-06 | Perforation Treatment Performed - Fractured |
| 2002-09-11 | Well Began Production |
| 2002-09-11 | Well Fluid changed to Gas |
| 2002-09-11 | Well Mode changed to Flowing |
| 2010-10-19 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-18 | Perforation Treatment Performed - Fractured |
| 2010-12-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-12-16 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1998-11-14 | Perforation | 855.00 | 861.00 | 7 |
| 2010-10-19 | Perforation | 486.50 | 487.50 | 13 |
| 2010-10-19 | Perforation | 590.00 | 591.00 | 13 |
| 2010-10-19 | Perforation | 314.40 | 314.90 | 13 |
| 2010-10-19 | Perforation | 332.30 | 332.80 | 13 |
| 2010-10-19 | Perforation | 376.80 | 377.30 | 13 |
| 2010-10-19 | Perforation | 318.00 | 318.50 | 13 |
| 2010-10-19 | Perforation | 324.70 | 325.20 | 13 |
| 2010-10-19 | Perforation | 352.00 | 354.00 | 13 |
| 2010-10-19 | Perforation | 367.00 | 369.00 | 13 |
| 2010-10-19 | Perforation | 249.00 | 252.00 | 13 |
| 1998-11-24 | Fracture | 855.00 | 861.00 | 0 |
| 2010-10-19 | Perforation | 268.00 | 269.00 | 13 |
| 2010-10-19 | Perforation | 381.00 | 384.00 | 13 |
| 2010-10-19 | Perforation | 433.00 | 436.00 | 13 |
| 2010-10-19 | Perforation | 439.00 | 440.00 | 13 |
| 2010-10-19 | Perforation | 395.00 | 398.00 | 13 |
| 2010-10-19 | Perforation | 408.00 | 411.00 | 13 |
| 2010-10-19 | Perforation | 425.60 | 427.60 | 13 |
| 2010-10-19 | Perforation | 555.80 | 556.80 | 13 |
| 2010-10-19 | Perforation | 564.80 | 565.30 | 13 |
| 2010-10-19 | Perforation | 546.40 | 547.40 | 13 |
| 1998-12-13 | Perforation | 832.00 | 838.00 | 7 |
| 2010-10-19 | Perforation | 554.00 | 554.50 | 13 |
| 2010-10-19 | Perforation | 568.40 | 568.90 | 13 |
| 2010-10-19 | Perforation | 604.70 | 605.70 | 13 |
| 2010-10-19 | Perforation | 612.80 | 613.30 | 13 |
| 2010-10-19 | Perforation | 573.70 | 574.20 | 13 |
| 2010-10-19 | Perforation | 585.80 | 586.80 | 13 |
| 2010-10-19 | Perforation | 540.70 | 541.20 | 13 |
| 2010-10-19 | Perforation | 481.90 | 483.90 | 13 |
| 2010-10-19 | Perforation | 500.50 | 501.50 | 13 |
| 2010-10-19 | Perforation | 448.10 | 448.60 | 13 |
| 2000-02-24 | Perforation | 687.00 | 689.00 | 7 |
| 2010-10-19 | Perforation | 456.70 | 457.20 | 13 |
| 2010-10-19 | Perforation | 502.70 | 504.70 | 13 |
| 2010-10-19 | Perforation | 533.90 | 534.90 | 13 |
| 2010-10-19 | Perforation | 529.80 | 530.30 | 13 |
| 2010-10-19 | Perforation | 505.20 | 505.70 | 13 |
| 2010-11-18 | Fracture | 249.00 | 591.00 | 0 |
| 2010-11-18 | Fracture | 245.60 | 613.30 | 0 |
| 2000-03-21 | Perforation | 678.00 | 680.00 | 7 |
| 2000-03-21 | Perforation | 669.00 | 671.00 | 7 |
| 2001-11-06 | Fracture | 669.00 | 689.00 | 0 |
| 2010-10-19 | Perforation | 245.60 | 246.10 | 13 |
| 2010-10-19 | Perforation | 311.70 | 312.20 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2002 | 2637 | 0.0 | 0.0 | 0.0 |
| 2003 | 5060 | 0.0 | 0.0 | 0.0 |
| 2004 | 7546 | 0.0 | 0.0 | 0.0 |
| 2005 | 8653 | 0.0 | 0.0 | 0.0 |
| 2006 | 8685 | 0.0 | 0.0 | 0.0 |
| 2007 | 8708 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 7229 | 0.0 | 0.0 | 0.0 |
| 2011 | 8296 | 0.0 | 0.0 | 0.0 |
| 2012 | 8778 | 0.0 | 0.0 | 0.0 |
| 2013 | 8711 | 0.0 | 0.0 | 0.0 |
| 2014 | 8671 | 0.0 | 0.0 | 0.0 |
| 2015 | 8699 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8745 | 0.0 | 0.0 | 0.0 |
| 2019 | 8562 | 0.0 | 0.0 | 0.0 |
| 2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[5]