X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285020310002

Well Details

Well ID: 0285020310002
Loading map...
Location: 00/10-03-028-02W5/2
Location Alias: 00/10-03-28-02 W5M
Location Alias 2: 00/10-03-028-02 W5/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 02
Section: 03
County/Municipality: Rocky View County
Well Name: Canlin CROSS 10-3-28-2
Operator Name: Bighorn Energy Corporation
License Number: 0017181
License Date: 1959-06-08
License Status: Issued
Spud Date: 1960-01-17
Final Drill Date: 1960-02-23
Well Total Depth: 2636.50 m
Surface Hole Latitude: 51.367550
Surface Hole Longitude: -114.198049

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-06-08 Obtained License
1960-01-18 Lost Circulation Occurred
1960-02-23 Finished Drilling
1960-02-24 Production Casing Operation Performed
1960-06-22 Perforation Treatment Performed - Jet Perforation
1960-06-24 Perforation Treatment Performed - Fractured
1964-11-22 Perforation Treatment Performed - Cement Squeeze
1964-11-25 Perforation Treatment Performed - Cement Squeeze
1965-07-01 Well Mode changed to Drilled and Cased
1965-10-14 Perforation Treatment Performed - Selective Bullet Perforations
1965-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-04 Well Began Production
1965-12-04 Well Fluid changed to Gas
1965-12-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-06-22 Perforation 2059.50 2061.70 13
1965-10-14 Selective Bullet Perforations 2593.80 2594.50 0
1965-10-14 Selective Bullet Perforations 2596.00 2596.00 0
1965-10-21 Acid Treatment 2577.70 2596.00 0
1960-06-24 Fracture 2059.50 2061.70 0
1964-11-22 Cement Squeeze 2059.50 2061.70 0
1964-11-25 Cement Squeeze 2059.50 2061.70 0
1965-10-14 Selective Bullet Perforations 2577.70 2579.20 0
1965-10-14 Selective Bullet Perforations 2581.00 2581.70 0
1965-10-14 Selective Bullet Perforations 2582.90 2585.60 0
1965-10-14 Selective Bullet Perforations 2588.10 2589.30 0
1965-10-14 Selective Bullet Perforations 2589.90 2592.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 2397 0.0 0.0 0.0
1969 8367 0.0 0.0 0.0
1970 7760 0.0 0.0 0.0
1971 7019 0.0 0.0 0.0
1972 8358 0.0 0.0 0.0
1973 8075 0.0 0.0 0.0
1974 8110 0.0 0.0 0.0
1975 8392 0.0 0.0 0.0
1976 8342 0.0 0.0 0.0
1977 8269 0.0 0.0 0.0
1978 7363 0.0 0.0 0.0
1979 8362 0.0 0.0 0.0
1980 7790 0.0 0.0 0.0
1981 5483 0.0 0.0 0.0
1982 4577 0.0 0.0 0.0
1983 4819 0.0 0.0 0.0
1984 2590 0.0 0.0 0.0
1985 4005 0.0 0.0 0.0
1986 3133 0.0 0.0 0.0
1987 180 0.0 0.0 0.0
1988 4135 0.0 0.0 0.0
1989 6903 0.0 0.0 0.0
1990 1962 0.0 0.0 0.0
1991 2449 0.0 0.0 0.0
1992 8113 0.0 0.0 0.0
1993 8080 0.0 0.0 0.0
1994 8281 0.0 0.0 0.0
1995 7498 0.0 0.0 0.0
1996 8306 0.0 0.0 0.0
1997 8682 0.0 0.0 0.0
1998 8579 0.0 0.0 0.0
1999 8113 0.0 0.0 0.0
2000 8558 0.0 0.0 0.0
2001 8599 0.0 0.0 0.0
2002 8338 0.0 0.0 0.0
2003 8599 0.0 0.0 0.0
2004 6347 0.0 0.0 0.0
2005 7876 0.0 0.0 0.0
2006 6934 0.0 0.0 0.0
2007 7654 0.0 0.0 0.0
2008 7040 0.0 0.0 0.0
2009 2080 0.0 0.0 0.0
2010 1902 0.0 0.0 0.0
2011 7058 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 5735 0.0 0.0 0.0
2015 5775 0.0 0.0 0.0
2016 6012 0.0 0.0 0.0
2017 7573 0.0 0.0 0.0
2018 6335 0.0 0.0 0.0
2019 7919 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1960-01-18 Lost Circulation 99.10 130.70

For data sources see[6]

References