X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285060310022

Well Details

Well ID: 0285060310022
Loading map...
Location: 02/10-03-028-06W5/2
Location Alias: 02/10-03-28-06 W5M
Location Alias 2: 02/10-03-028-06 W5/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 06
Section: 03
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 10-3-28-6
Operator Name: Canlin Energy Corporation
License Number: 0233851
License Date: 2000-02-16
License Status: Issued
Spud Date: 2000-03-06
Final Drill Date: 2000-03-31
Well Total Depth: 2343.00 m
Surface Hole Latitude: 51.365490
Surface Hole Longitude: -114.767762

For data sources see[1][2]

Well History

Date Event
2000-02-16 Obtained License
2000-03-11 Surface Casing Operation Performed
2000-03-12 Direction Drilling Operation Performed - Deviate
2000-03-31 Finished Drilling
2000-04-01 Well Log Performed
2000-04-02 Well Log Performed
2000-04-04 Production Casing Operation Performed
2000-04-04 Rig Released
2000-04-05 Well Log Performed
2000-05-01 Well Log Performed
2000-05-02 Perforation Treatment Performed - Jet Perforation
2000-05-02 Well Log Performed
2000-05-04 Perforation Treatment Performed - Chemical Squeeze
2000-05-05 Perforation Treatment Performed - Jet Perforation
2000-05-06 Perforation Treatment Performed - Jet Perforation
2000-05-06 Well Log Performed
2000-05-07 Perforation Treatment Performed - Chemical Squeeze
2000-05-08 Perforation Treatment Performed - Jet Perforation
2000-05-09 Well Log Performed
2000-05-10 Perforation Treatment Performed - Chemical Squeeze
2000-06-27 Well Log Performed
2000-12-03 Well Mode changed to Drilled and Cased

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-03-12 302.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-05-02 Perforation 2137.50 2139.50 15
2000-05-08 Perforation 2038.00 2040.50 15
2000-05-08 Perforation 2029.00 2036.00 15
2000-05-08 Perforation 2026.00 2028.00 15
2000-05-10 Chemical Squeeze 2026.00 2040.50 0
2000-05-02 Perforation 2132.00 2135.50 15
2000-05-04 Chemical Squeeze 2132.00 2139.50 0
2000-05-05 Perforation 2087.00 2090.50 15
2000-05-05 Perforation 2084.00 2087.00 15
2000-05-06 Perforation 2077.00 2083.00 15
2000-05-06 Perforation 2072.00 2077.00 15
2000-05-06 Perforation 2067.00 2072.00 15
2000-05-07 Chemical Squeeze 2067.00 2090.50 0

For data sources see[5]



References