X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285060713000

Well Details

Well ID: 0285060713000
Loading map...
Location: 00/13-07-028-06W5/0
Location Alias: 00/13-07-28-06 W5M
Location Alias 2: 00/13-07-028-06 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 06
Section: 07
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 13-7-28-6
Operator Name: Canlin Energy Corporation
License Number: 0204335
License Date: 1997-08-01
License Status: Amended
Spud Date: 1997-09-22
Final Drill Date: 1998-01-31
Well Total Depth: 4075.00 m
Surface Hole Latitude: 51.380092
Surface Hole Longitude: -114.859073

For data sources see[1][2]

Well History

Date Event
1997-08-01 Obtained License
1997-09-26 Surface Casing Operation Performed
1997-10-14 Direction Drilling Operation Performed - Sidetrack Fish
1997-10-14 Plug Back Performed
1997-10-16 Direction Drilling Operation Performed - Deviate
1997-11-26 Well Log Performed
1997-11-29 Intermediate Casing Operation Performed
1997-12-10 Well Log Performed
1998-01-21 Well Log Performed
1998-01-31 Finished Drilling
1998-01-31 Well Log Performed
1998-01-31 Well Mode changed to Drilled and Cased
1998-02-04 Liner Casing Operation Performed
1998-02-07 Rig Released
1998-03-04 Well Log Performed
1998-03-07 Perforation Treatment Performed - Jet Perforation
1998-03-08 Perforation Treatment Performed - Jet Perforation
1998-03-08 Well Log Performed
1998-03-10 Well Log Performed
1998-03-11 Well Log Performed
1998-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-24 Perforation Treatment Performed - Jet Perforation
1998-03-25 Perforation Treatment Performed - Jet Perforation
1998-03-26 Well Log Performed
1998-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-01 Perforation Treatment Performed - Jet Perforation
1998-06-01 Well Log Performed
1998-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-19 Well Log Performed
1998-07-22 Well Began Production
1998-07-22 Well Fluid changed to Gas
1998-07-22 Well Mode changed to Flowing
1998-07-23 Well Log Performed
1998-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-26 Plug Back Performed
1998-07-26 Well Log Performed
1998-08-14 Well Log Performed
1998-08-15 Well Log Performed
2019-05-22 Well Fluid changed to Gas
2019-05-22 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-10-14 934.00 Sidetrack fish
1997-10-16 963.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-07 Perforation 3788.00 3796.00 10
1998-03-08 Perforation 3769.00 3771.00 10
1998-03-08 Perforation 3773.00 3784.00 10
1998-03-21 Acid Treatment 3755.00 3896.00 0
1998-03-24 Perforation 3631.00 3638.00 5
1998-03-24 Perforation 3647.50 3665.00 5
1998-03-24 Perforation 3671.00 3674.00 5
1998-03-24 Perforation 3679.00 3696.00 5
1998-03-24 Perforation 3700.00 3705.00 5
1998-03-24 Perforation 3717.50 3720.50 5
1998-03-25 Perforation 3522.00 3527.00 5
1998-03-07 Perforation 3801.00 3812.00 10
1998-03-25 Perforation 3535.00 3542.00 5
1998-03-25 Perforation 3553.00 3566.00 5
1998-03-25 Perforation 3577.00 3593.00 5
1998-03-25 Perforation 3595.00 3597.00 5
1998-03-25 Perforation 3600.00 3613.00 5
1998-03-25 Perforation 3617.00 3630.00 5
1998-05-29 Acid Treatment 3522.00 3896.00 0
1998-06-01 Perforation 3343.00 3360.00 13
1998-06-01 Perforation 3385.00 3391.00 13
1998-06-03 Acid Treatment 3343.00 3391.00 0
1998-03-07 Perforation 3814.00 3822.00 10
1998-07-26 Packing Device Capped w/Cement 3782.80 3786.50 0
1998-03-07 Perforation 3827.50 3829.00 10
1998-03-07 Perforation 3837.00 3854.00 10
1998-03-07 Perforation 3858.00 3868.50 10
1998-03-07 Perforation 3871.00 3884.00 10
1998-03-07 Perforation 3893.50 3896.00 10
1998-03-08 Perforation 3755.00 3766.00 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1190 0.0 0.0 0.0
1999 6943 0.0 0.0 0.0
2000 7069 0.0 0.0 0.0
2001 7336 0.0 0.0 0.0
2002 7598 0.0 0.0 0.0
2003 6260 0.0 0.0 0.0
2004 5856 0.0 0.0 0.0
2005 6497 0.0 0.0 0.0
2006 4726 0.0 0.0 0.0
2007 4315 0.0 0.0 0.0
2008 4846 0.0 0.0 0.0
2009 6376 0.0 0.0 0.0
2010 7137 0.0 0.0 0.0
2011 7880 0.0 0.0 0.0
2012 6711 0.0 0.0 0.0
2013 8085 0.0 0.0 0.0
2014 7212 0.0 0.0 0.0
2015 5288 0.0 0.0 0.0
2016 1733 0.0 0.0 0.0
2017 4294 0.0 0.0 0.0
2018 600 0.0 0.0 0.0

For data sources see[6]

References