X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285070201002

Well Details

Well ID: 0285070201002
Loading map...
Location: 00/01-02-028-07W5/2
Location Alias: 00/01-02-28-07 W5M
Location Alias 2: 00/01-02-028-07 W5/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 07
Section: 02
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 1-2-28-7
Operator Name: Canlin Energy Corporation
License Number: 0265552
License Date: 2002-01-03
License Status: Issued
Spud Date: 2002-01-24
Final Drill Date: 2002-02-14
Well Total Depth: 2632.00 m
Surface Hole Latitude: 51.356855
Surface Hole Longitude: -114.877010

For data sources see[1][2]

Well History

Date Event
2002-01-03 Obtained License
2002-01-29 Surface Casing Operation Performed
2002-01-30 Direction Drilling Operation Performed - Deviate
2002-02-14 Finished Drilling
2002-02-14 Well Log Performed
2002-02-14 Well Mode changed to Drilled and Cased
2002-02-18 Well Log Performed
2002-02-19 Production Casing Operation Performed
2002-02-20 Rig Released
2002-02-26 Well Log Performed
2002-03-10 Perforation Treatment Performed - Jet Perforation
2002-03-10 Well Log Performed
2002-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-11 Perforation Treatment Performed - Fractured
2002-03-13 Well Log Performed
2002-03-14 Perforation Treatment Performed - Fractured
2002-03-14 Perforation Treatment Performed - Jet Perforation
2002-08-11 Well Log Performed
2002-08-12 Perforation Treatment Performed - Jet Perforation
2002-08-18 Perforation Treatment Performed - Fractured
2002-09-20 Well Began Production
2002-09-20 Well Fluid changed to Gas
2002-09-20 Well Mode changed to Flowing
2008-03-26 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-01-30 630.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-03-10 Perforation 2503.00 2506.00 14
2002-08-12 Perforation 2110.50 2111.50 17
2002-08-12 Perforation 2105.00 2108.50 17
2002-08-18 Fracture 2105.00 2116.00 0
2002-03-10 Perforation 2507.50 2512.00 14
2002-03-11 Fracture 2503.00 2512.00 0
2002-03-11 Acid Treatment 2503.00 2512.00 0
2002-03-14 Perforation 2424.00 2429.00 14
2002-03-14 Perforation 2444.00 2448.00 14
2002-03-14 Perforation 2448.00 2452.00 14
2002-03-14 Fracture 2424.00 2452.00 0
2002-08-12 Perforation 2112.50 2116.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1343 0.0 0.0 0.0
2003 381 0.0 0.0 0.0
2004 5002 0.0 0.0 0.0
2005 7044 0.0 0.0 0.0
2006 7430 0.0 0.0 0.0
2007 8474 0.0 0.0 0.0
2008 7171 0.0 0.0 0.0
2009 7631 0.0 0.0 0.0
2010 8164 0.0 0.0 0.0
2011 8271 0.0 0.0 0.0
2012 7467 0.0 0.0 0.0
2013 7921 0.0 0.0 0.0
2014 7833 0.0 0.0 0.0
2015 8408 0.0 0.0 0.0
2016 8365 0.0 0.0 0.0
2017 8223 0.0 0.0 0.0
2018 8438 0.0 0.0 0.0
2019 6425 0.0 0.0 0.0
2020 2158 0.0 0.0 0.0

For data sources see[6]

References