If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0285071416002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.399761,"lon":-114.872163,"icon":""}]} |
Location: 00/16-14-028-07W5/2 | |
Location Alias: 00/16-14-28-07 W5M | |
Location Alias 2: 00/16-14-028-07 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 5 | |
Range: 07 | |
Section: 14 | |
County/Municipality: Municipal District of Bighorn No. 8 | |
Well Name: Canlin WCATH 16-14-28-7 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0304797 | |
License Date: 2004-02-26 | |
License Status: Issued | |
Spud Date: 2004-03-21 | |
Final Drill Date: 2004-04-08 | |
Well Total Depth: 2192.00 m | |
Surface Hole Latitude: 51.399761 | |
Surface Hole Longitude: -114.872163 |
Date | Event |
---|---|
2004-02-26 | Obtained License |
2004-03-24 | Surface Casing Operation Performed |
2004-03-29 | Direction Drilling Operation Performed - Deviate |
2004-04-05 | Well Log Performed |
2004-04-08 | Finished Drilling |
2004-04-08 | Well Log Performed |
2004-04-08 | Well Mode changed to Drilled and Cased |
2004-04-11 | Production Casing Operation Performed |
2004-04-11 | Rig Released |
2004-04-24 | Well Log Performed |
2004-04-25 | Perforation Treatment Performed - Jet Perforation |
2004-04-25 | Well Log Performed |
2004-04-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-04-26 | Plug Back Performed |
2004-04-26 | Well Log Performed |
2004-04-27 | Perforation Treatment Performed - Jet Perforation |
2004-04-27 | Well Log Performed |
2004-04-30 | Perforation Treatment Performed - Fractured |
2004-05-04 | Perforation Treatment Performed - Jet Perforation |
2004-05-06 | Perforation Treatment Performed - Fractured |
2004-07-27 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2004-03-29 | 1034.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-04-25 | Perforation | 2109.00 | 2113.00 | 17 |
2004-05-04 | Perforation | 1707.50 | 1711.50 | 17 |
2004-05-06 | Fracture | 1690.50 | 1711.50 | 0 |
2004-07-27 | Perforation | 1889.50 | 1900.00 | 13 |
2004-04-26 | Packing Device Capped w/Cement | 2097.00 | 2105.00 | 0 |
2004-04-27 | Perforation | 1884.00 | 1886.00 | 17 |
2004-04-27 | Perforation | 1889.50 | 1891.50 | 17 |
2004-04-27 | Perforation | 1892.00 | 1900.00 | 17 |
2004-04-30 | Fracture | 1884.00 | 1900.00 | 0 |
2004-05-04 | Perforation | 1690.50 | 1692.00 | 17 |
2004-05-04 | Perforation | 1693.00 | 1703.50 | 17 |
2004-05-04 | Perforation | 1705.50 | 1706.50 | 17 |
For data sources see[5]