If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0285072213000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.41083,"lon":-114.924424,"icon":""}]} |
Location: 00/13-22-028-07W5/0 | |
Location Alias: 00/13-22-28-07 W5M | |
Location Alias 2: 00/13-22-028-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 5 | |
Range: 07 | |
Section: 22 | |
County/Municipality: Municipal District of Bighorn No. 8 | |
Well Name: Canlin WCATH 13-22-28-7 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0225589 | |
License Date: 1999-08-18 | |
License Status: Suspension | |
Spud Date: 1999-09-12 | |
Final Drill Date: 1999-11-13 | |
Well Total Depth: 3848.00 m | |
Surface Hole Latitude: 51.410830 | |
Surface Hole Longitude: -114.924424 |
Date | Event |
---|---|
1999-08-18 | Obtained License |
1999-09-14 | Surface Casing Operation Performed |
1999-09-16 | Direction Drilling Operation Performed - Deviate |
1999-11-13 | Finished Drilling |
1999-11-13 | Well Log Performed |
1999-11-14 | Well Log Performed |
1999-11-18 | Well Log Performed |
1999-11-22 | Production Casing Operation Performed |
1999-11-23 | Perforation Treatment Performed - Open-Hole Completion |
1999-11-23 | Rig Released |
1999-11-23 | Well Mode changed to Drilled and Cased |
1999-11-30 | Well Log Performed |
1999-12-11 | Perforation Treatment Performed - Chemical Squeeze |
1999-12-11 | Perforation Treatment Performed - Jet Perforation |
1999-12-11 | Well Log Performed |
1999-12-16 | Perforation Treatment Performed - Fractured |
2000-01-05 | Perforation Treatment Performed - Jet Perforation |
2000-01-06 | Well Log Performed |
2000-01-11 | Perforation Treatment Performed - Chemical Squeeze |
2000-01-12 | Perforation Treatment Performed - Fractured |
2000-01-16 | Perforation Treatment Performed - Jet Perforation |
2000-01-17 | Perforation Treatment Performed - Jet Perforation |
2000-01-18 | Perforation Treatment Performed - Chemical Squeeze |
2000-01-18 | Perforation Treatment Performed - Jet Perforation |
2000-01-21 | Perforation Treatment Performed - Fractured |
2000-04-03 | Well Began Production |
2000-04-03 | Well Fluid changed to Gas |
2000-04-03 | Well Mode changed to Flowing |
2007-06-08 | Well Log Performed |
2007-06-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-09-01 | Well Fluid changed to Gas |
2011-09-01 | Well Mode changed to Suspended |
2012-07-01 | Well Fluid changed to Gas |
2012-07-01 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1999-09-16 | 421.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-11-23 | Open Hole/Barefoot Completion | 3836.20 | 3848.00 | 0 |
2000-01-17 | Perforation | 3429.00 | 3438.50 | 13 |
2000-01-17 | Perforation | 3402.00 | 3415.00 | 13 |
2000-01-17 | Perforation | 3385.50 | 3389.00 | 13 |
2000-01-17 | Perforation | 3381.00 | 3383.00 | 13 |
2000-01-18 | Perforation | 3359.50 | 3363.00 | 13 |
2000-01-18 | Perforation | 3353.00 | 3355.00 | 13 |
2000-01-18 | Perforation | 3335.50 | 3347.00 | 13 |
2000-01-18 | Chemical Squeeze | 3335.50 | 3460.00 | 0 |
2000-01-21 | Fracture | 3335.50 | 3460.00 | 0 |
2007-06-09 | Packing Device Capped w/Cement | 3423.60 | 3426.00 | 0 |
1999-12-11 | Perforation | 3540.00 | 3549.00 | 17 |
1999-12-11 | Chemical Squeeze | 3540.00 | 3549.00 | 0 |
1999-12-16 | Fracture | 3540.00 | 3549.00 | 0 |
2000-01-05 | Perforation | 3482.50 | 3492.50 | 17 |
2000-01-11 | Chemical Squeeze | 3482.50 | 3492.50 | 0 |
2000-01-12 | Fracture | 3482.50 | 3492.50 | 0 |
2000-01-16 | Perforation | 3454.00 | 3460.00 | 13 |
2000-01-16 | Perforation | 3441.50 | 3452.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 5774 | 0.0 | 0.0 | 0.0 |
2001 | 7363 | 0.0 | 0.0 | 0.0 |
2002 | 8144 | 0.0 | 0.0 | 0.0 |
2003 | 5021 | 0.0 | 0.0 | 0.0 |
2004 | 5130 | 0.0 | 0.0 | 0.0 |
2005 | 285 | 0.0 | 0.0 | 0.0 |
2012 | 275 | 0.0 | 0.0 | 0.0 |
2013 | 759 | 0.0 | 0.0 | 0.0 |
2014 | 661 | 0.0 | 0.0 | 0.0 |
2015 | 1430 | 0.0 | 0.0 | 0.0 |
2016 | 418 | 0.0 | 0.0 | 0.0 |
2017 | 815 | 0.0 | 0.0 | 0.0 |
2018 | 844 | 0.0 | 0.0 | 0.0 |
2019 | 720 | 0.0 | 0.0 | 0.0 |
For data sources see[6]