If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294030415000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.458878,"lon":-110.366831,"icon":""}]} |
Location: 00/15-04-029-03W4/0 | |
Location Alias: 00/15-04-29-03 W4M | |
Location Alias 2: 00/15-04-029-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 03 | |
Section: 04 | |
County/Municipality: Special Areas No. 3 | |
Well Name: LEXXOR PURCELL BENTON 15-4-29-3 | |
Operator Name: TAQA North Ltd. | |
License Number: 0207421 | |
License Date: 1997-10-21 | |
License Status: RecCertified | |
Spud Date: 1997-10-21 | |
Final Drill Date: 1997-10-24 | |
Well Total Depth: 994.40 m | |
Surface Hole Latitude: 51.458878 | |
Surface Hole Longitude: -110.366831 |
Date | Event |
---|---|
1997-10-21 | Obtained License |
1997-10-22 | Surface Casing Operation Performed |
1997-10-24 | Finished Drilling |
1997-10-24 | Well Log Performed |
1997-10-24 | Well Mode changed to Drilled and Cased |
1997-10-25 | Drill Stem Test Performed |
1997-10-26 | Production Casing Operation Performed |
1997-10-26 | Rig Released |
1997-11-23 | Perforation Treatment Performed - Jet Perforation |
1997-12-01 | Well Began Production |
1997-12-01 | Well Fluid changed to Crude Oil |
1997-12-01 | Well Mode changed to Pumping |
1998-02-19 | Well Fluid changed to Crude Oil |
1998-02-19 | Well Mode changed to Suspended |
1998-06-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-06-13 | Plug Back Performed |
1998-06-14 | Well Log Performed |
1998-06-19 | Well Abandoned |
1998-06-19 | Well Fluid changed to Crude Oil |
1998-06-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-11-23 | Perforation | 908.00 | 911.00 | 17 |
1998-06-13 | Packing Device Capped w/Cement | 894.00 | 902.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 739 | 0.0 | 0.0 | 0.0 |
1998 | 504 | 0.0 | 0.0 | 0.0 |
For data sources see[5]