X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294050912000

Well Details

Well ID: 0294050912000
Loading map...
Location: 00/12-09-029-05W4/0
Location Alias: 00/12-09-29-05 W4M
Location Alias 2: 00/12-09-029-05 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 05
Section: 09
County/Municipality: Special Areas No. 3
Well Name: Canlin OYEN 12-9-29-5
Operator Name: Canlin Energy Corporation
License Number: 0145158
License Date: 1990-08-22
License Status: Suspension
Spud Date: 1990-08-23
Final Drill Date: 1990-08-26
Well Total Depth: 950.00 m
Surface Hole Latitude: 51.470254
Surface Hole Longitude: -110.656325

For data sources see[1][2]

Well History

Date Event
1990-08-22 Obtained License
1990-08-24 Surface Casing Operation Performed
1990-08-26 Finished Drilling
1990-08-26 Well Log Performed
1990-08-26 Well Mode changed to Drilled and Cased
1990-08-27 Production Casing Operation Performed
1990-08-27 Rig Released
1990-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-31 Perforation Treatment Performed - Jet Perforation
1990-08-31 Plug Back Performed
1990-08-31 Well Log Performed
1990-09-01 Perforation Treatment Performed - Jet Perforation
1990-09-13 Well Began Production
1990-09-13 Well Fluid changed to Gas
1990-09-13 Well Mode changed to Flowing
1996-09-30 Well Fluid changed to Gas
1996-09-30 Well Mode changed to Suspended
1996-10-24 Perforation Treatment Performed - Chemical Squeeze
1998-10-01 Well Fluid changed to Gas
1998-10-01 Well Mode changed to Flowing
2017-06-01 Well Fluid changed to Gas
2017-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-08-31 Perforation 912.00 914.00 13
1990-08-31 Packing Device Capped w/Cement 902.00 910.00 0
1990-08-31 Perforation 806.00 807.00 13
1990-09-01 Perforation 258.00 260.50 13
1990-09-01 Perforation 261.00 263.00 13
1996-10-24 Chemical Squeeze 806.00 807.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2530 0.0 0.0 0.0
1991 8264 0.0 0.0 0.0
1992 8676 0.0 0.0 0.0
1993 8602 0.0 0.0 0.0
1994 8561 0.0 0.0 0.0
1995 8416 0.0 0.0 0.0
1996 4062 0.0 0.0 0.0
1998 2208 0.0 0.0 0.0
1999 8735 0.0 0.0 0.0
2000 8251 0.0 0.0 0.0
2001 7638 0.0 0.0 0.0
2002 8738 0.0 0.0 0.0
2003 8698 0.0 0.0 0.0
2004 8734 0.0 0.0 0.0
2005 8657 0.0 0.0 0.0
2006 8571 0.0 0.0 0.0
2007 8642 0.0 0.0 0.0
2008 8240 0.0 0.0 0.0
2009 8548 0.0 0.0 0.0
2010 8569 0.0 0.0 0.0
2011 8420 0.0 0.0 0.0
2012 8765 0.0 0.0 0.0
2013 8108 0.0 0.0 0.0
2014 8405 0.0 0.0 0.0
2015 8733 0.0 0.0 0.0
2016 3317 0.0 0.0 0.0

For data sources see[5]

References