X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294150606000

Well Details

Well ID: 0294150606000
Loading map...
Location: 00/06-06-029-15W4/0
Location Alias: 00/06-06-29-15 W4M
Location Alias 2: 00/06-06-029-15 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 15
Section: 06
County/Municipality: Special Areas No. 2
Well Name: MAYNARD ET AL COYOTE 6-6-29-15
Operator Name: Tintagel Energy Corporation
License Number: 0113333
License Date: 1985-02-13
License Status: RecCertified
Spud Date: 1985-02-19
Final Drill Date: 1985-02-23
Well Total Depth: 1311.00 m
Surface Hole Latitude: 51.449342
Surface Hole Longitude: -112.104623

For data sources see[1][2]

Well History

Date Event
1985-02-13 Obtained License
1985-02-20 Surface Casing Operation Performed
1985-02-23 Finished Drilling
1985-02-23 Well Mode changed to Drilled and Cased
1985-02-24 Well Log Performed
1985-02-25 Production Casing Operation Performed
1985-02-25 Rig Released
1985-03-02 Perforation Treatment Performed - Jet Perforation
1985-03-02 Well Log Performed
1985-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-01 Well Began Production
1985-05-01 Well Fluid changed to Crude Oil
1985-05-01 Well Mode changed to Flowing
1986-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-17 Plug Back Performed
1986-12-17 Well Log Performed
1986-12-18 Perforation Treatment Performed - Jet Perforation
1986-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-19 Plug Back Performed
1986-12-20 Perforation Treatment Performed - Jet Perforation
1986-12-21 Perforation Treatment Performed - Jet Perforation
1986-12-21 Well Log Performed
1987-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-01-08 Plug Back Performed
1987-01-08 Well Log Performed
1987-01-09 Perforation Treatment Performed - Jet Perforation
1987-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-01-11 Plug Back Performed
1987-01-11 Well Fluid changed to Crude Oil
1987-01-11 Well Log Performed
1987-01-11 Well Mode changed to Abandoned
1987-01-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-02 Perforation 1294.00 1295.00 13
1987-01-09 Perforation 1093.50 1095.00 13
1987-01-11 Packing Device Capped w/Cement 1077.00 1085.00 0
1985-03-03 Acid Treatment 1294.00 1295.00 0
1986-12-17 Packing Device Capped w/Cement 1280.00 1288.00 0
1986-12-18 Perforation 1271.50 1273.50 13
1986-12-19 Packing Device Capped w/Cement 1267.00 1269.00 0
1986-12-20 Perforation 1258.50 1260.00 13
1986-12-20 Perforation 1252.00 1253.50 13
1986-12-21 Perforation 1221.50 1223.50 13
1987-01-08 Packing Device Capped w/Cement 1200.00 1208.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3096 0.0 0.0 0.0

For data sources see[5]

References