If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294191601000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.476123,"lon":-112.609801,"icon":""}]} |
Location: 00/01-16-029-19W4/0 | |
Location Alias: 00/01-16-29-19 W4M | |
Location Alias 2: 00/01-16-029-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 19 | |
Section: 16 | |
County/Municipality: Starland County | |
Well Name: MARQUEE DRUM 1-16-29-19 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0018033 | |
License Date: 1959-10-30 | |
License Status: Abandoned | |
Spud Date: 1959-11-02 | |
Final Drill Date: 1959-11-24 | |
Well Total Depth: 1709.60 m | |
Surface Hole Latitude: 51.476123 | |
Surface Hole Longitude: -112.609801 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1959-10-30 | Obtained License |
1959-11-08 | Drill Stem Test Performed |
1959-11-11 | Drill Stem Test Performed |
1959-11-12 | Drill Stem Test Performed |
1959-11-13 | Drill Stem Test Performed |
1959-11-23 | Drill Stem Test Performed |
1959-11-24 | Finished Drilling |
1959-11-24 | Well Mode changed to Drilled and Cased |
1959-11-26 | Production Casing Operation Performed |
1959-12-08 | Perforation Treatment Performed - Jet Perforation |
1959-12-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-01-21 | Well Began Production |
1960-01-21 | Well Fluid changed to Crude Oil |
1960-01-21 | Well Mode changed to Pumping |
1960-03-24 | Perforation Treatment Performed - Bullet Perforation |
1960-11-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1960-11-29 | Well Fluid changed to Crude Oil |
1960-11-29 | Well Mode changed to Suspended |
1989-06-24 | Perforation Treatment Performed - Jet Perforation |
1989-06-24 | Well Log Performed |
1989-06-25 | Perforation Treatment Performed - Jet Perforation |
1989-06-25 | Well Log Performed |
1989-06-26 | Perforation Treatment Performed - Fractured |
1989-07-14 | Well Fluid changed to Crude Oil |
1989-07-14 | Well Mode changed to Pumping |
1990-06-26 | Perforation Treatment Performed - Cement Squeeze |
1992-05-22 | Perforation Treatment Performed - Jet Perforation |
1992-05-22 | Perforation Treatment Performed - Remedial Casing |
1992-05-22 | Well Fluid changed to Crude Oil |
1992-05-22 | Well Mode changed to Abandoned |
1992-05-24 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1959-12-08 | Perforation | 1298.40 | 1304.50 | 7 |
1989-06-26 | Fracture | 1292.40 | 1307.60 | 0 |
1990-06-26 | Cement Squeeze | 1292.40 | 1307.60 | 0 |
1992-05-22 | Perforation | 305.00 | 306.00 | 7 |
1992-05-22 | Remedial Casing Cementing | 305.00 | 306.00 | 0 |
1959-12-10 | Acid Treatment | 1298.40 | 1304.50 | 0 |
1960-03-24 | Bullet Perforation | 1292.40 | 1298.40 | 7 |
1960-03-24 | Bullet Perforation | 1304.50 | 1307.60 | 7 |
1960-11-29 | Packing Device Capped w/Cement | 1286.30 | 1286.30 | 0 |
1989-06-24 | Perforation | 1292.40 | 1298.40 | 7 |
1989-06-24 | Perforation | 1298.40 | 1304.50 | 7 |
1989-06-24 | Perforation | 1304.50 | 1307.60 | 7 |
1989-06-25 | Perforation | 1301.50 | 1307.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 2800 | 0.0 | 0.0 | 0.0 |
For data sources see[5]