X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294201306002

Well Details

Well ID: 0294201306002
Loading map...
Location: 00/06-13-029-20W4/2
Location Alias: 00/06-13-29-20 W4M
Location Alias 2: 00/06-13-029-20 W4/02
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 20
Section: 13
County/Municipality: Drumheller
Well Name: BEARSPAW ET AL DRUM 6-13-29-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0022607
License Date: 1962-06-18
License Status: Issued
Spud Date: 1962-06-23
Final Drill Date: 1962-07-11
Well Total Depth: 1568.50 m
Surface Hole Latitude: 51.480180
Surface Hole Longitude: -112.690823

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-06-18 Obtained License
1962-06-29 Drill Stem Test Performed
1962-07-09 Drill Stem Test Performed
1962-07-11 Finished Drilling
1962-07-11 Well Mode changed to Drilled and Cased
1962-07-12 Production Casing Operation Performed
1962-08-02 Perforation Treatment Performed - Bullet Perforation
1962-08-10 Perforation Treatment Performed - Fractured
1962-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-01 Well Began Production
1962-10-01 Well Fluid changed to Crude Oil
1962-10-01 Well Mode changed to Flowing
1963-08-01 Well Fluid changed to Gas
1963-08-01 Well Mode changed to Flowing
1972-04-26 Perforation Treatment Performed - Cement Squeeze
1972-04-26 Well Fluid changed to Gas
1972-04-26 Well Mode changed to Abandoned Zone
1980-05-30 Perforation Treatment Performed - Cement Squeeze
1980-05-30 Perforation Treatment Performed - Jet Perforation
1985-06-10 Perforation Treatment Performed - Cement Squeeze
1985-06-13 Perforation Treatment Performed - Jet Perforation
1985-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-14 Well Log Performed
2014-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-11-28 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-08-02 Bullet Perforation 1535.60 1538.00 13
1985-06-13 Perforation 1545.40 1552.00 13
1985-06-14 Acid Treatment 1545.40 1552.00 0
2014-09-15 Acid Treatment 1545.40 1552.00 0
2019-11-28 Chemical Squeeze 1545.40 1552.00 0
1962-08-02 Bullet Perforation 1212.20 1215.20 13
1962-08-10 Fracture 1212.20 1215.20 0
1962-08-10 Fracture 1535.60 1538.00 0
1962-08-18 Acid Treatment 1535.60 1538.00 0
1972-04-26 Cement Squeeze 1212.20 1215.20 0
1980-05-30 Cement Squeeze 1535.60 1538.00 0
1980-05-30 Perforation 1536.80 1539.20 13
1985-06-10 Cement Squeeze 1536.80 1539.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 3259 0.0 0.0 0.0
1970 2064 0.0 0.0 0.0
1971 5973 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-15 No Incident Encountered 0.00 0.00
2019-11-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References