X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294230306000

Well Details

Well ID: 0294230306000
Loading map...
Location: 00/06-03-029-23W4/0
Location Alias: 00/06-03-29-23 W4M
Location Alias 2: 00/06-03-029-23 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 23
Section: 03
County/Municipality: Kneehill County
Well Name: EOG CECSAL CARBON 6-3-29-23
Operator Name: Canadian Natural Resources Limited
License Number: 0055520
License Date: 1975-10-23
License Status: Suspension
Spud Date: 1975-10-28
Final Drill Date: 1975-11-10
Well Total Depth: 1615.40 m
Surface Hole Latitude: 51.449238
Surface Hole Longitude: -113.161912

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-23 Obtained License
1975-11-01 Drill Stem Test Performed
1975-11-04 Drill Stem Test Performed
1975-11-10 Finished Drilling
1975-11-11 Drill Stem Test Performed
1975-11-12 Drill Stem Test Performed
1975-11-13 Drill Stem Test Performed
1975-11-14 Production Casing Operation Performed
1975-11-15 Well Mode changed to Drilled and Cased
1975-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-06 Perforation Treatment Performed - Jet Perforation
1976-01-05 Perforation Treatment Performed - Jet Perforation
1976-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-26 Perforation Treatment Performed - Cement Squeeze
1976-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-05-25 Well Began Production
1977-05-25 Well Fluid changed to Crude Oil
1977-05-25 Well Mode changed to Pumping
1985-01-30 Well Log Performed
1985-01-31 Perforation Treatment Performed - Jet Perforation
1985-02-05 Perforation Treatment Performed - Acid Wash - No Pressure
2014-12-31 Well Fluid changed to Crude Oil
2014-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-12-06 Perforation 1551.70 1555.70 3
1976-05-26 Cement Squeeze 670.00 679.10 0
1976-05-30 Acid Treatment 1551.70 1583.10 0
1985-01-31 Perforation 1570.90 1575.20 13
1985-01-31 Perforation 1551.70 1555.70 13
1985-02-05 Acid Wash 1551.70 1575.20 0
1975-12-06 Perforation 1561.50 1564.80 3
1975-12-06 Perforation 1570.90 1575.20 3
1975-12-06 Perforation 1579.50 1583.10 3
1975-12-06 Acid Treatment 1551.70 1583.10 0
1976-01-05 Perforation 670.00 672.10 7
1976-01-05 Perforation 675.70 677.00 7
1976-01-05 Perforation 677.90 679.10 7
1976-01-06 Acid Treatment 670.00 679.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 102 0.0 0.0 0.0
1976 77 0.0 0.0 0.0
1977 2540 0.0 0.0 0.0
1978 1941 0.0 0.0 0.0
1979 6406 0.0 0.0 0.0
1980 7235 0.0 0.0 0.0
1981 7667 0.0 0.0 0.0
1982 7993 0.0 0.0 0.0
1983 6722 0.0 0.0 0.0
1984 6382 0.0 0.0 0.0
1985 7052 0.0 0.0 0.0
1986 7638 0.0 0.0 0.0
1987 6556 0.0 0.0 0.0
1988 6543 0.0 0.0 0.0
1989 6754 0.0 0.0 0.0
1990 6664 0.0 0.0 0.0
1991 7157 0.0 0.0 0.0
1992 6589 0.0 0.0 0.0
1993 7553 0.0 0.0 0.0
1994 7991 0.0 0.0 0.0
1995 6804 0.0 0.0 0.0
1996 7350 0.0 0.0 0.0
1997 5749 0.0 0.0 0.0
1998 4810 0.0 0.0 0.0
1999 2948 0.0 0.0 0.0
2000 6160 0.0 0.0 0.0
2001 7902 0.0 0.0 0.0
2002 4824 0.0 0.0 0.0
2003 8167 0.0 0.0 0.0
2004 8771 0.0 0.0 0.0
2005 8700 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8715 0.0 0.0 0.0
2011 8642 0.0 0.0 0.0
2012 7000 0.0 0.0 0.0

For data sources see[5]

References