X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294232108000

Well Details

Well ID: 0294232108000
Loading map...
Location: 00/08-21-029-23W4/0
Location Alias: 00/08-21-29-23 W4M
Location Alias 2: 00/08-21-029-23 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 23
Section: 21
County/Municipality: Kneehill County
Well Name: ECA CARBON 8-21-29-23
Operator Name: Lynx Energy ULC
License Number: 0335316
License Date: 2005-07-26
License Status: Amended
Spud Date: 2005-08-06
Final Drill Date: 2005-08-07
Well Total Depth: 798.00 m
Surface Hole Latitude: 51.495643
Surface Hole Longitude: -113.172809

For data sources see[1][2]

Well History

Date Event
2005-07-26 Obtained License
2005-08-05 Surface Casing Operation Performed
2005-08-07 Finished Drilling
2005-08-07 Production Casing Operation Performed
2005-08-07 Rig Released
2005-08-07 Well Mode changed to Drilled and Cased
2005-08-12 Well Log Performed
2005-09-18 Perforation Treatment Performed - Jet Perforation
2005-09-29 Perforation Treatment Performed - Jet Perforation
2005-09-30 Perforation Treatment Performed - Jet Perforation
2005-10-03 Perforation Treatment Performed - Fractured
2005-11-05 Well Began Production
2005-11-05 Well Fluid changed to Gas
2005-11-05 Well Mode changed to Flowing
2008-11-05 Well Fluid changed to Coalbed Methane-Coals and Other
2008-11-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-18 Perforation 573.00 574.00 13
2005-09-29 Perforation 455.00 456.50 14
2005-09-30 Perforation 188.50 189.50 14
2005-09-30 Perforation 238.80 239.30 14
2005-09-30 Perforation 243.50 244.50 14
2005-09-30 Perforation 295.00 297.50 14
2005-09-30 Perforation 298.50 300.00 14
2005-09-30 Perforation 306.50 309.50 14
2005-09-30 Perforation 311.00 312.00 14
2005-09-30 Perforation 332.00 332.50 14
2005-09-30 Perforation 335.50 336.50 14
2005-09-18 Perforation 748.50 750.00 13
2005-09-30 Perforation 341.60 342.10 14
2005-10-03 Fracture 573.00 574.00 0
2005-10-03 Fracture 455.00 456.50 0
2005-10-03 Fracture 421.00 422.50 0
2005-10-03 Fracture 413.50 414.50 0
2005-10-03 Fracture 407.00 408.00 0
2005-10-03 Fracture 398.80 399.80 0
2005-10-03 Fracture 383.00 383.50 0
2005-10-03 Fracture 355.50 358.00 0
2005-10-03 Fracture 347.50 349.50 0
2005-09-29 Perforation 347.50 349.50 14
2005-10-03 Fracture 341.60 342.10 0
2005-10-03 Fracture 332.00 336.50 0
2005-10-03 Fracture 311.00 312.00 0
2005-10-03 Fracture 306.50 309.50 0
2005-10-03 Fracture 295.00 300.00 0
2005-10-03 Fracture 243.50 244.00 0
2005-10-03 Fracture 238.80 239.30 0
2005-10-03 Fracture 188.50 189.50 0
2005-09-29 Perforation 355.50 358.00 14
2005-09-29 Perforation 383.00 383.50 14
2005-09-29 Perforation 398.80 399.80 14
2005-09-29 Perforation 407.00 408.00 14
2005-09-29 Perforation 413.50 414.50 14
2005-09-29 Perforation 421.00 422.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1328 0.0 0.0 0.0
2006 8753 0.0 0.0 0.0
2007 8706 0.0 0.0 0.0
2008 8143 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8612 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8751 0.0 0.0 0.0
2015 8755 0.0 0.0 0.0
2016 8778 0.0 0.0 0.0
2017 8696 0.0 0.0 0.0
2018 8701 0.0 0.0 0.0
2019 8577 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References