X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294233605000

Well Details

Well ID: 0294233605000
Loading map...
Location: 00/05-36-029-23W4/0
Location Alias: 00/05-36-29-23 W4M
Location Alias 2: 00/05-36-029-23 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 23
Section: 36
County/Municipality: Kneehill County
Well Name: COMPTON CARBON 5-36-29-23
Operator Name: Lexin Resources Ltd.
License Number: 0395607
License Date: 2008-03-26
License Status: Issued
Spud Date: 2008-03-30
Final Drill Date: 2008-04-01
Well Total Depth: 809.00 m
Surface Hole Latitude: 51.523618
Surface Hole Longitude: -113.120604

For data sources see[1][2]

Well History

Date Event
2008-03-26 Obtained License
2008-03-31 Surface Casing Operation Performed
2008-04-01 Finished Drilling
2008-04-01 Production Casing Operation Performed
2008-04-01 Rig Released
2008-04-01 Well Mode changed to Drilled and Cased
2008-04-04 Well Log Performed
2008-07-26 Perforation Treatment Performed - Jet Perforation
2008-07-27 Perforation Treatment Performed - Jet Perforation
2008-08-03 Perforation Treatment Performed - Fractured
2008-08-09 Perforation Treatment Performed - Jet Perforation
2008-08-18 Perforation Treatment Performed - Fractured
2008-10-25 Perforation Treatment Performed - Casing Patch (Over Perfs)
2008-10-26 Well Log Performed
2011-04-01 Well Began Production
2011-04-01 Well Fluid changed to Coalbed Methane-Coals and Other
2011-04-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-07-26 Perforation 726.00 728.00 13
2008-08-09 Perforation 379.00 381.00 7
2008-08-09 Perforation 361.10 361.70 13
2008-08-09 Perforation 315.00 316.00 7
2008-08-09 Perforation 275.30 276.30 7
2008-08-09 Perforation 332.90 334.90 7
2008-08-09 Perforation 321.00 321.50 13
2008-08-09 Perforation 425.30 426.20 7
2008-08-09 Perforation 525.00 527.20 7
2008-08-09 Perforation 479.00 479.60 13
2008-08-09 Perforation 542.40 543.60 7
2008-07-26 Perforation 744.00 746.00 13
2008-08-09 Perforation 539.80 540.70 7
2008-08-09 Perforation 447.30 448.20 7
2008-08-09 Perforation 433.70 434.80 7
2008-08-09 Perforation 440.80 441.30 13
2008-08-18 Fracture 409.60 448.20 0
2008-08-18 Fracture 315.00 334.90 0
2008-08-18 Fracture 275.30 276.30 0
2008-08-18 Fracture 361.10 375.60 0
2008-08-18 Fracture 379.00 381.00 0
2008-08-18 Fracture 479.00 479.60 0
2008-07-27 Perforation 679.00 681.00 13
2008-08-18 Fracture 525.00 543.60 0
2008-10-25 Casing Patch 525.00 543.60 0
2008-08-03 Fracture 679.00 681.00 0
2008-08-03 Fracture 744.00 746.00 0
2008-08-03 Fracture 726.00 728.00 0
2008-08-09 Perforation 373.50 375.60 7
2008-08-09 Perforation 365.30 366.10 7
2008-08-09 Perforation 409.60 410.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6584 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8633 0.0 0.0 0.0
2014 8572 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8747 0.0 0.0 0.0
2017 1094 0.0 0.0 0.0

For data sources see[5]

References