X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294240306020

Well Details

Well ID: 0294240306020
Loading map...
Location: 02/06-03-029-24W4/0
Location Alias: 02/06-03-29-24 W4M
Location Alias 2: 02/06-03-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 03
County/Municipality: Kneehill County
Well Name: PIONEER ET AL 102 SWALWELL 6-3-29-24
Operator Name: TAQA North Ltd.
License Number: 0336337
License Date: 2005-08-12
License Status: Issued
Spud Date: 2005-11-24
Final Drill Date: 2005-11-25
Well Total Depth: 583.00 m
Surface Hole Latitude: 51.452040
Surface Hole Longitude: -113.300115

For data sources see[1][2]

Well History

Date Event
2005-08-12 Obtained License
2005-11-24 Surface Casing Operation Performed
2005-11-25 Finished Drilling
2005-11-25 Production Casing Operation Performed
2005-11-25 Rig Released
2005-11-25 Well Mode changed to Drilled and Cased
2005-12-08 Well Log Performed
2006-01-13 Perforation Treatment Performed - Jet Perforation
2006-01-16 Perforation Treatment Performed - Fractured
2006-03-03 Well Began Production
2006-03-03 Well Fluid changed to Coalbed Methane-Coals Only
2006-03-03 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-01-13 Perforation 152.70 153.20 14
2006-01-13 Perforation 374.00 377.00 14
2006-01-13 Perforation 379.70 380.20 14
2006-01-13 Perforation 383.80 384.30 14
2006-01-13 Perforation 391.60 392.10 14
2006-01-13 Perforation 398.00 399.00 14
2006-01-13 Perforation 402.20 402.70 14
2006-01-13 Perforation 422.80 423.30 14
2006-01-13 Perforation 427.00 428.50 14
2006-01-13 Perforation 437.80 442.30 14
2006-01-13 Perforation 472.50 473.00 14
2006-01-13 Perforation 155.70 156.20 14
2006-01-13 Perforation 486.00 486.50 14
2006-01-13 Perforation 496.50 498.00 14
2006-01-13 Perforation 503.40 503.90 14
2006-01-13 Perforation 511.40 512.90 14
2006-01-13 Perforation 521.10 521.60 14
2006-01-13 Perforation 538.50 539.00 14
2006-01-13 Perforation 541.20 542.70 14
2006-01-13 Perforation 549.00 549.50 14
2006-01-16 Fracture 152.70 549.50 0
2006-01-13 Perforation 157.20 158.70 14
2006-01-13 Perforation 260.70 261.20 14
2006-01-13 Perforation 265.70 266.20 14
2006-01-13 Perforation 272.50 273.50 14
2006-01-13 Perforation 284.00 284.50 14
2006-01-13 Perforation 321.30 321.80 14
2006-01-13 Perforation 368.90 370.40 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 7287 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8634 0.0 0.0 0.0
2010 8516 0.0 0.0 0.0
2011 8657 0.0 0.0 0.0
2012 8694 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References