X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294240608000

Well Details

Well ID: 0294240608000
Loading map...
Location: 00/08-06-029-24W4/0
Location Alias: 00/08-06-29-24 W4M
Location Alias 2: 00/08-06-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 06
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 8-6-29-24
Operator Name: Ember Resources Inc.
License Number: 0318960
License Date: 2004-11-16
License Status: Issued
Spud Date: 2004-11-25
Final Drill Date: 2004-11-26
Well Total Depth: 915.00 m
Surface Hole Latitude: 51.452089
Surface Hole Longitude: -113.357785

For data sources see[1][2]

Well History

Date Event
2004-11-16 Obtained License
2004-11-25 Production Casing Operation Performed
2004-11-25 Surface Casing Operation Performed
2004-11-26 Finished Drilling
2004-11-26 Rig Released
2004-11-26 Well Mode changed to Drilled and Cased
2004-12-09 Well Log Performed
2005-01-07 Perforation Treatment Performed - Jet Perforation
2005-01-07 Well Log Performed
2005-01-15 Perforation Treatment Performed - Fractured
2005-01-27 Well Began Production
2005-01-27 Well Fluid changed to Coalbed Methane-Coals Only
2005-01-27 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-01-07 Perforation 183.00 183.50 17
2005-01-07 Perforation 454.50 455.00 17
2005-01-07 Perforation 457.00 459.00 17
2005-01-07 Perforation 472.50 473.50 17
2005-01-07 Perforation 474.50 475.50 17
2005-01-07 Perforation 501.00 501.50 17
2005-01-07 Perforation 505.00 505.50 17
2005-01-07 Perforation 512.00 513.00 17
2005-01-07 Perforation 515.50 516.50 17
2005-01-07 Perforation 526.00 527.50 17
2005-01-07 Perforation 534.00 534.50 17
2005-01-07 Perforation 226.50 227.50 17
2005-01-07 Perforation 538.30 539.30 17
2005-01-07 Perforation 552.00 553.00 17
2005-01-07 Perforation 574.00 575.50 17
2005-01-07 Perforation 577.00 577.50 17
2005-01-15 Fracture 574.00 577.50 0
2005-01-15 Fracture 552.00 553.00 0
2005-01-15 Fracture 538.30 539.30 0
2005-01-15 Fracture 534.00 534.50 0
2005-01-15 Fracture 526.00 527.50 0
2005-01-15 Fracture 512.00 516.50 0
2005-01-07 Perforation 277.50 278.50 17
2005-01-15 Fracture 501.00 505.50 0
2005-01-15 Fracture 472.50 475.50 0
2005-01-15 Fracture 454.50 459.00 0
2005-01-15 Fracture 430.60 431.10 0
2005-01-15 Fracture 417.70 418.20 0
2005-01-15 Fracture 411.00 412.00 0
2005-01-15 Fracture 400.80 403.00 0
2005-01-15 Fracture 342.50 343.50 0
2005-01-15 Fracture 277.50 278.50 0
2005-01-15 Fracture 226.50 227.50 0
2005-01-07 Perforation 342.50 343.50 17
2005-01-15 Fracture 183.00 183.50 0
2005-01-07 Perforation 400.80 401.80 17
2005-01-07 Perforation 402.50 403.00 17
2005-01-07 Perforation 411.00 412.00 17
2005-01-07 Perforation 417.70 418.20 17
2005-01-07 Perforation 430.60 431.10 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 8135 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8780 0.0 0.0 0.0
2009 8015 0.0 0.0 0.0
2010 4608 0.0 0.0 0.0
2011 8700 0.0 0.0 0.0
2012 8344 0.0 0.0 0.0
2013 8730 0.0 0.0 0.0
2014 8599 0.0 0.0 0.0
2015 8676 0.0 0.0 0.0
2016 8616 0.0 0.0 0.0
2017 7957 0.0 0.0 0.0
2018 5388 0.0 0.0 0.0
2019 6521 0.0 0.0 0.0
2020 2116 0.0 0.0 0.0

For data sources see[5]

References