If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294240610000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.455434,"lon":-113.365746,"icon":""}]} |
Location: 00/10-06-029-24W4/0 | |
Location Alias: 00/10-06-29-24 W4M | |
Location Alias 2: 00/10-06-029-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 24 | |
Section: 06 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 10-6-29-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411663 | |
License Date: 2009-07-30 | |
License Status: Issued | |
Spud Date: 2009-08-18 | |
Final Drill Date: 2009-08-19 | |
Well Total Depth: 911.00 m | |
Surface Hole Latitude: 51.455434 | |
Surface Hole Longitude: -113.365746 |
Date | Event |
---|---|
2009-07-30 | Obtained License |
2009-08-19 | Finished Drilling |
2009-08-19 | Surface Casing Operation Performed |
2009-08-19 | Well Mode changed to Drilled and Cased |
2009-08-20 | Production Casing Operation Performed |
2009-08-20 | Rig Released |
2009-09-03 | Well Log Performed |
2009-09-23 | Perforation Treatment Performed - Jet Perforation |
2009-09-27 | Perforation Treatment Performed - Fractured |
2009-11-04 | Well Began Production |
2009-11-04 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-11-04 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-09-23 | Perforation | 213.90 | 214.40 | 13 |
2009-09-23 | Perforation | 446.10 | 446.60 | 13 |
2009-09-23 | Perforation | 448.60 | 450.10 | 13 |
2009-09-23 | Perforation | 453.90 | 454.40 | 13 |
2009-09-23 | Perforation | 460.10 | 461.10 | 13 |
2009-09-23 | Perforation | 466.20 | 467.20 | 13 |
2009-09-23 | Perforation | 499.00 | 499.50 | 13 |
2009-09-23 | Perforation | 506.80 | 507.30 | 13 |
2009-09-23 | Perforation | 511.40 | 511.90 | 13 |
2009-09-23 | Perforation | 520.00 | 521.00 | 13 |
2009-09-23 | Perforation | 534.20 | 535.20 | 13 |
2009-09-23 | Perforation | 273.10 | 273.60 | 13 |
2009-09-23 | Perforation | 539.40 | 539.90 | 13 |
2009-09-23 | Perforation | 545.60 | 546.60 | 13 |
2009-09-23 | Perforation | 563.70 | 564.70 | 13 |
2009-09-23 | Perforation | 567.10 | 568.10 | 13 |
2009-09-27 | Fracture | 567.10 | 568.10 | 0 |
2009-09-27 | Fracture | 563.70 | 564.70 | 0 |
2009-09-27 | Fracture | 545.60 | 546.60 | 0 |
2009-09-27 | Fracture | 539.40 | 539.90 | 0 |
2009-09-27 | Fracture | 534.20 | 535.20 | 0 |
2009-09-27 | Fracture | 520.00 | 521.00 | 0 |
2009-09-23 | Perforation | 377.30 | 379.80 | 13 |
2009-09-27 | Fracture | 511.40 | 511.90 | 0 |
2009-09-27 | Fracture | 506.80 | 507.30 | 0 |
2009-09-27 | Fracture | 499.00 | 499.50 | 0 |
2009-09-27 | Fracture | 466.20 | 467.20 | 0 |
2009-09-27 | Fracture | 460.10 | 461.10 | 0 |
2009-09-27 | Fracture | 453.90 | 454.40 | 0 |
2009-09-27 | Fracture | 446.10 | 450.10 | 0 |
2009-09-27 | Fracture | 442.10 | 442.60 | 0 |
2009-09-27 | Fracture | 424.70 | 425.20 | 0 |
2009-09-27 | Fracture | 403.30 | 403.80 | 0 |
2009-09-23 | Perforation | 386.20 | 388.20 | 13 |
2009-09-27 | Fracture | 395.80 | 396.30 | 0 |
2009-09-27 | Fracture | 386.20 | 390.70 | 0 |
2009-09-27 | Fracture | 377.30 | 379.80 | 0 |
2009-09-27 | Fracture | 273.10 | 273.60 | 0 |
2009-09-27 | Fracture | 213.90 | 214.40 | 0 |
2009-09-23 | Perforation | 388.20 | 390.70 | 13 |
2009-09-23 | Perforation | 395.80 | 396.30 | 13 |
2009-09-23 | Perforation | 403.30 | 403.80 | 13 |
2009-09-23 | Perforation | 424.70 | 425.20 | 13 |
2009-09-23 | Perforation | 442.10 | 442.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 1392 | 0.0 | 0.0 | 0.0 |
2010 | 8756 | 0.0 | 0.0 | 0.0 |
2011 | 8700 | 0.0 | 0.0 | 0.0 |
2012 | 8460 | 0.0 | 0.0 | 0.0 |
2013 | 8730 | 0.0 | 0.0 | 0.0 |
2014 | 8599 | 0.0 | 0.0 | 0.0 |
2015 | 8676 | 0.0 | 0.0 | 0.0 |
2016 | 8616 | 0.0 | 0.0 | 0.0 |
2017 | 7957 | 0.0 | 0.0 | 0.0 |
2018 | 5388 | 0.0 | 0.0 | 0.0 |
2019 | 6520 | 0.0 | 0.0 | 0.0 |
2020 | 2116 | 0.0 | 0.0 | 0.0 |
For data sources see[5]