X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294241207022

Well Details

Well ID: 0294241207022
Loading map...
Location: 02/07-12-029-24W4/2
Location Alias: 02/07-12-29-24 W4M
Location Alias 2: 02/07-12-029-24 W4/02
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 12
County/Municipality: Kneehill County
Well Name: PIONEER SWALWELL 7-12-29-24
Operator Name: TAQA North Ltd.
License Number: 0149460
License Date: 1991-07-19
License Status: Issued
Spud Date: 1991-07-27
Final Drill Date: 1991-08-06
Well Total Depth: 2016.00 m
Surface Hole Latitude: 51.464454
Surface Hole Longitude: -113.246787

For data sources see[1][2]

Well History

Date Event
1991-07-19 Obtained License
1991-07-28 Surface Casing Operation Performed
1991-08-06 Finished Drilling
1991-08-06 Well Log Performed
1991-08-06 Well Mode changed to Drilled and Cased
1991-08-07 Drill Stem Test Performed
1991-08-09 Production Casing Operation Performed
1991-08-09 Rig Released
1991-08-20 Well Log Performed
1991-08-22 Well Log Performed
1991-08-23 Perforation Treatment Performed - Jet Perforation
1991-08-25 Perforation Treatment Performed - Acid Wash - No Pressure
1991-08-27 Well Log Performed
1991-08-28 Perforation Treatment Performed - Jet Perforation
1991-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-09 Perforation Treatment Performed - Fractured
1993-09-01 Well Began Production
1993-09-01 Well Fluid changed to Gas
1993-09-01 Well Mode changed to Flowing
2004-02-05 Perforation Treatment Performed - Jet Perforation
2004-02-06 Perforation Treatment Performed - Remedial Casing
2004-02-14 Perforation Treatment Performed - Jet Perforation
2004-02-14 Well Log Performed
2020-02-01 Well Fluid changed to Gas
2020-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-08-23 Perforation 1978.50 1981.00 13
1991-08-25 Acid Wash 1978.50 1981.00 0
1991-08-28 Perforation 1979.00 1982.00 13
1991-08-29 Acid Treatment 1978.50 1982.00 0
1991-10-09 Fracture 1978.50 1982.00 0
2004-02-05 Perforation 315.00 316.00 13
2004-02-06 Remedial Casing Cementing 315.00 316.00 0
2004-02-14 Perforation 726.00 730.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2217 0.0 0.0 0.0
1994 8732 0.0 0.0 0.0
1995 8757 0.0 0.0 0.0
1996 8777 0.0 0.0 0.0
1997 8758 0.0 0.0 0.0
1998 8614 0.0 0.0 0.0
1999 8747 0.0 0.0 0.0
2000 8662 0.0 0.0 0.0
2001 6530 0.0 0.0 0.0
2002 8432 0.0 0.0 0.0
2003 8362 0.0 0.0 0.0
2004 7569 0.0 0.0 0.0
2005 8183 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 7113 0.0 0.0 0.0
2008 5935 0.0 0.0 0.0
2009 8341 0.0 0.0 0.0
2010 6407 0.0 0.0 0.0
2011 5231 0.0 0.0 0.0
2012 8734 0.0 0.0 0.0
2013 7295 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8087 0.0 0.0 0.0
2016 8779 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 7873 0.0 0.0 0.0

For data sources see[5]

References