If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0294242308002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.495664,"lon":-113.267339,"icon":""}]} |
| Location: 00/08-23-029-24W4/2 | |
| Location Alias: 00/08-23-29-24 W4M | |
| Location Alias 2: 00/08-23-029-24 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 029 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 23 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER SWALWELL 8-23-29-24 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0335549 | |
| License Date: 2005-07-28 | |
| License Status: Issued | |
| Spud Date: 2005-08-06 | |
| Final Drill Date: 2005-08-12 | |
| Well Total Depth: 816.00 m | |
| Surface Hole Latitude: 51.495664 | |
| Surface Hole Longitude: -113.267339 |
| Date | Event |
|---|---|
| 2005-07-28 | Obtained License |
| 2005-08-07 | Surface Casing Operation Performed |
| 2005-08-12 | Finished Drilling |
| 2005-08-12 | Production Casing Operation Performed |
| 2005-08-12 | Rig Released |
| 2005-08-12 | Well Mode changed to Drilled and Cased |
| 2005-09-01 | Well Log Performed |
| 2005-09-16 | Perforation Treatment Performed - Jet Perforation |
| 2005-09-26 | Perforation Treatment Performed - Jet Perforation |
| 2005-09-29 | Perforation Treatment Performed - Fractured |
| 2005-12-21 | Well Began Production |
| 2005-12-21 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2005-12-21 | Well Mode changed to Flowing |
| 2008-02-11 | Well Structure changed to Commingled |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-09-16 | Perforation | 526.00 | 528.00 | 14 |
| 2005-09-26 | Perforation | 324.00 | 326.00 | 14 |
| 2005-09-26 | Perforation | 328.80 | 329.30 | 14 |
| 2005-09-26 | Perforation | 350.20 | 350.70 | 14 |
| 2005-09-26 | Perforation | 352.40 | 353.40 | 14 |
| 2005-09-26 | Perforation | 357.00 | 358.00 | 14 |
| 2005-09-26 | Perforation | 362.00 | 363.00 | 14 |
| 2005-09-26 | Perforation | 363.50 | 364.00 | 14 |
| 2005-09-26 | Perforation | 370.30 | 371.30 | 14 |
| 2005-09-26 | Perforation | 425.90 | 426.90 | 14 |
| 2005-09-26 | Perforation | 432.10 | 433.10 | 14 |
| 2005-09-16 | Perforation | 529.00 | 530.50 | 14 |
| 2005-09-26 | Perforation | 437.50 | 438.00 | 14 |
| 2005-09-26 | Perforation | 441.50 | 442.00 | 14 |
| 2005-09-26 | Perforation | 448.00 | 449.00 | 14 |
| 2005-09-29 | Fracture | 526.00 | 530.50 | 0 |
| 2005-09-29 | Fracture | 448.00 | 449.00 | 0 |
| 2005-09-29 | Fracture | 441.50 | 442.00 | 0 |
| 2005-09-29 | Fracture | 437.50 | 438.00 | 0 |
| 2005-09-29 | Fracture | 432.10 | 433.10 | 0 |
| 2005-09-29 | Fracture | 425.90 | 426.90 | 0 |
| 2005-09-29 | Fracture | 370.30 | 371.30 | 0 |
| 2005-09-16 | Perforation | 531.20 | 532.20 | 14 |
| 2005-09-29 | Fracture | 362.00 | 364.00 | 0 |
| 2005-09-29 | Fracture | 357.00 | 358.00 | 0 |
| 2005-09-29 | Fracture | 350.20 | 353.40 | 0 |
| 2005-09-29 | Fracture | 324.00 | 329.30 | 0 |
| 2005-09-29 | Fracture | 309.00 | 311.00 | 0 |
| 2005-09-29 | Fracture | 302.50 | 304.50 | 0 |
| 2005-09-29 | Fracture | 256.80 | 258.90 | 0 |
| 2005-09-29 | Fracture | 209.10 | 209.60 | 0 |
| 2005-09-16 | Perforation | 735.00 | 738.50 | 14 |
| 2005-09-26 | Perforation | 209.10 | 209.60 | 14 |
| 2005-09-26 | Perforation | 256.80 | 257.80 | 14 |
| 2005-09-26 | Perforation | 258.40 | 258.90 | 14 |
| 2005-09-26 | Perforation | 302.50 | 304.50 | 14 |
| 2005-09-26 | Perforation | 309.00 | 311.00 | 14 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 264 | 0.0 | 0.0 | 0.0 |
| 2006 | 8759 | 0.0 | 0.0 | 0.0 |
| 2007 | 8759 | 0.0 | 0.0 | 0.0 |
| 2008 | 984 | 0.0 | 0.0 | 0.0 |
For data sources see[5]