X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294242502000

Well Details

Well ID: 0294242502000
Loading map...
Location: 00/02-25-029-24W4/0
Location Alias: 00/02-25-29-24 W4M
Location Alias 2: 00/02-25-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 25
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 2-25-29-24
Operator Name: Ember Resources Inc.
License Number: 0337382
License Date: 2005-08-31
License Status: Issued
Spud Date: 2005-09-03
Final Drill Date: 2005-09-07
Well Total Depth: 805.00 m
Surface Hole Latitude: 51.505952
Surface Hole Longitude: -113.248391

For data sources see[1][2]

Well History

Date Event
2005-08-31 Obtained License
2005-09-03 Surface Casing Operation Performed
2005-09-07 Finished Drilling
2005-09-07 Production Casing Operation Performed
2005-09-07 Rig Released
2005-09-07 Well Mode changed to Drilled and Cased
2005-09-21 Well Log Performed
2005-10-07 Perforation Treatment Performed - Jet Perforation
2005-10-12 Perforation Treatment Performed - Fractured
2005-12-21 Well Began Production
2005-12-21 Well Fluid changed to Coalbed Methane-Coals and Other
2005-12-21 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-07 Perforation 266.00 267.00 14
2005-10-07 Perforation 400.00 402.50 14
2005-10-07 Perforation 426.50 427.00 14
2005-10-07 Perforation 453.40 454.40 14
2005-10-07 Perforation 460.00 461.00 14
2005-10-07 Perforation 465.50 466.00 14
2005-10-07 Perforation 471.10 471.60 14
2005-10-12 Fracture 465.50 466.00 0
2005-10-12 Fracture 460.00 461.00 0
2005-10-12 Fracture 453.40 454.40 0
2005-10-12 Fracture 426.50 427.00 0
2005-10-07 Perforation 315.00 322.00 14
2005-10-12 Fracture 400.00 402.50 0
2005-10-12 Fracture 395.00 398.00 0
2005-10-12 Fracture 390.50 391.00 0
2005-10-12 Fracture 383.20 384.20 0
2005-10-12 Fracture 355.00 356.00 0
2005-10-12 Fracture 339.00 343.50 0
2005-10-12 Fracture 334.00 335.00 0
2005-10-12 Fracture 325.00 326.50 0
2005-10-12 Fracture 315.00 322.00 0
2005-10-12 Fracture 266.00 267.00 0
2005-10-07 Perforation 325.00 326.50 14
2005-10-12 Fracture 471.10 471.60 0
2005-10-07 Perforation 334.00 335.00 14
2005-10-07 Perforation 339.00 343.50 14
2005-10-07 Perforation 355.00 356.00 14
2005-10-07 Perforation 383.20 384.20 14
2005-10-07 Perforation 390.50 391.00 14
2005-10-07 Perforation 395.00 398.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 264 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8713 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8751 0.0 0.0 0.0
2015 8754 0.0 0.0 0.0
2016 8778 0.0 0.0 0.0
2017 8696 0.0 0.0 0.0
2018 8701 0.0 0.0 0.0
2019 8577 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References