X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294242506020

Well Details

Well ID: 0294242506020
Loading map...
Location: 02/06-25-029-24W4/0
Location Alias: 02/06-25-29-24 W4M
Location Alias 2: 02/06-25-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 25
County/Municipality: Kneehill County
Well Name: EMBER 102 SWALWELL 6-25-29-24
Operator Name: Ember Resources Inc.
License Number: 0334759
License Date: 2005-07-18
License Status: Issued
Spud Date: 2005-07-29
Final Drill Date: 2005-07-30
Well Total Depth: 828.00 m
Surface Hole Latitude: 51.508890
Surface Hole Longitude: -113.255228

For data sources see[1][2]

Well History

Date Event
2005-07-18 Obtained License
2005-07-22 Surface Casing Operation Performed
2005-07-30 Finished Drilling
2005-07-30 Production Casing Operation Performed
2005-07-30 Rig Released
2005-07-30 Well Mode changed to Drilled and Cased
2005-08-05 Well Log Performed
2005-08-22 Perforation Treatment Performed - Jet Perforation
2005-08-29 Perforation Treatment Performed - Fractured
2005-12-21 Well Began Production
2005-12-21 Well Fluid changed to Coalbed Methane-Coals and Other
2005-12-21 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-22 Perforation 210.20 211.20 13
2005-08-22 Perforation 397.50 399.00 13
2005-08-22 Perforation 401.00 402.50 13
2005-08-22 Perforation 427.30 427.80 13
2005-08-22 Perforation 436.50 437.00 13
2005-08-22 Perforation 453.50 454.40 13
2005-08-22 Perforation 459.80 460.80 13
2005-08-22 Perforation 467.00 467.50 13
2005-08-22 Perforation 474.00 475.00 13
2005-08-29 Fracture 474.00 475.00 0
2005-08-29 Fracture 467.00 467.50 0
2005-08-22 Perforation 279.00 279.50 13
2005-08-29 Fracture 459.80 460.80 0
2005-08-29 Fracture 453.50 454.40 0
2005-08-29 Fracture 436.50 437.00 0
2005-08-29 Fracture 427.30 427.80 0
2005-08-29 Fracture 401.00 402.50 0
2005-08-29 Fracture 397.50 399.00 0
2005-08-29 Fracture 395.50 397.00 0
2005-08-29 Fracture 382.50 383.50 0
2005-08-29 Fracture 355.00 356.00 0
2005-08-29 Fracture 337.20 338.70 0
2005-08-22 Perforation 322.50 325.00 13
2005-08-29 Fracture 335.20 336.20 0
2005-08-29 Fracture 331.00 333.00 0
2005-08-29 Fracture 279.00 279.50 0
2005-08-29 Fracture 210.20 211.20 0
2005-08-22 Perforation 331.00 333.00 13
2005-08-22 Perforation 335.20 336.20 13
2005-08-22 Perforation 337.20 338.70 13
2005-08-22 Perforation 355.00 356.00 13
2005-08-22 Perforation 382.50 383.50 13
2005-08-22 Perforation 395.50 397.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 264 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8774 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8751 0.0 0.0 0.0
2015 8754 0.0 0.0 0.0
2016 8778 0.0 0.0 0.0
2017 8696 0.0 0.0 0.0
2018 8701 0.0 0.0 0.0
2019 8577 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References