X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294243508000

Well Details

Well ID: 0294243508000
Loading map...
Location: 00/08-35-029-24W4/0
Location Alias: 00/08-35-29-24 W4M
Location Alias 2: 00/08-35-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 35
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 8-35-29-24
Operator Name: Ember Resources Inc.
License Number: 0334889
License Date: 2005-07-19
License Status: Issued
Spud Date: 2005-07-24
Final Drill Date: 2005-07-27
Well Total Depth: 873.00 m
Surface Hole Latitude: 51.524271
Surface Hole Longitude: -113.264691

For data sources see[1][2]

Well History

Date Event
2005-07-19 Obtained License
2005-07-24 Surface Casing Operation Performed
2005-07-27 Finished Drilling
2005-07-27 Production Casing Operation Performed
2005-07-27 Rig Released
2005-07-27 Well Mode changed to Drilled and Cased
2005-08-05 Well Log Performed
2005-08-08 Perforation Treatment Performed - Jet Perforation
2005-08-12 Perforation Treatment Performed - Jet Perforation
2005-08-22 Perforation Treatment Performed - Fractured
2005-12-22 Well Began Production
2005-12-22 Well Fluid changed to Gas
2005-12-22 Well Mode changed to Flowing
2008-02-08 Well Fluid changed to Coalbed Methane-Coals and Other
2008-02-08 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-08 Perforation 677.50 680.50 13
2005-08-12 Perforation 395.50 396.50 13
2005-08-12 Perforation 400.00 404.00 13
2005-08-12 Perforation 422.00 423.00 13
2005-08-12 Perforation 441.00 441.50 13
2005-08-12 Perforation 442.20 443.20 13
2005-08-12 Perforation 470.50 471.00 13
2005-08-12 Perforation 478.00 479.00 13
2005-08-12 Perforation 493.30 494.90 13
2005-08-12 Perforation 500.20 501.20 13
2005-08-12 Perforation 506.60 507.10 13
2005-08-08 Perforation 830.00 833.00 13
2005-08-12 Perforation 508.00 509.00 13
2005-08-12 Perforation 540.00 542.00 13
2005-08-22 Fracture 540.00 542.00 0
2005-08-22 Fracture 508.00 509.00 0
2005-08-22 Fracture 506.60 507.10 0
2005-08-22 Fracture 500.20 501.20 0
2005-08-22 Fracture 493.30 494.90 0
2005-08-22 Fracture 478.00 479.00 0
2005-08-22 Fracture 470.50 471.00 0
2005-08-22 Fracture 442.20 443.20 0
2005-08-08 Perforation 835.00 836.00 13
2005-08-22 Fracture 440.10 441.50 0
2005-08-22 Fracture 422.00 423.00 0
2005-08-22 Fracture 400.00 404.00 0
2005-08-22 Fracture 395.50 396.50 0
2005-08-22 Fracture 390.00 391.00 0
2005-08-22 Fracture 379.00 380.00 0
2005-08-22 Fracture 377.60 378.10 0
2005-08-22 Fracture 373.50 375.00 0
2005-08-22 Fracture 321.50 322.00 0
2005-08-22 Fracture 250.00 250.50 0
2005-08-12 Perforation 250.00 250.50 13
2005-08-12 Perforation 321.50 322.00 13
2005-08-12 Perforation 373.50 375.00 13
2005-08-12 Perforation 377.60 378.10 13
2005-08-12 Perforation 379.00 380.00 13
2005-08-12 Perforation 390.00 391.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 237 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8609 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8751 0.0 0.0 0.0
2015 8754 0.0 0.0 0.0
2016 8778 0.0 0.0 0.0
2017 8696 0.0 0.0 0.0
2018 8702 0.0 0.0 0.0
2019 8577 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References