X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294250916020

Well Details

Well ID: 0294250916020
Loading map...
Location: 02/16-09-029-25W4/0
Location Alias: 02/16-09-29-25 W4M
Location Alias 2: 02/16-09-029-25 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 25
Section: 09
County/Municipality: Kneehill County
Well Name: PNR ENER 102 SWALWELL 16-9-29-25
Operator Name: TAQA North Ltd.
License Number: 0344289
License Date: 2005-12-02
License Status: Issued
Spud Date: 2005-12-08
Final Drill Date: 2005-12-10
Well Total Depth: 654.00 m
Surface Hole Latitude: 51.473716
Surface Hole Longitude: -113.455227

For data sources see[1][2]

Well History

Date Event
2005-12-02 Obtained License
2005-12-08 Surface Casing Operation Performed
2005-12-10 Finished Drilling
2005-12-10 Production Casing Operation Performed
2005-12-10 Rig Released
2005-12-10 Well Mode changed to Drilled and Cased
2005-12-22 Well Log Performed
2006-01-28 Perforation Treatment Performed - Jet Perforation
2006-05-05 Well Began Production
2006-05-05 Well Fluid changed to Coalbed Methane-Coals Only
2006-05-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-01-28 Perforation 175.80 176.30 14
2006-01-28 Perforation 421.90 422.40 14
2006-01-28 Perforation 426.80 427.80 14
2006-01-28 Perforation 438.20 440.70 14
2006-01-28 Perforation 446.80 447.30 14
2006-01-28 Perforation 450.00 450.50 14
2006-01-28 Perforation 472.00 472.50 14
2006-01-28 Perforation 476.80 477.80 14
2006-01-28 Perforation 483.50 484.00 14
2006-01-28 Perforation 497.50 500.00 14
2006-01-28 Perforation 524.20 524.70 14
2006-01-28 Perforation 182.40 182.90 14
2006-01-28 Perforation 526.70 527.20 14
2006-01-28 Perforation 540.70 541.70 14
2006-01-28 Perforation 549.20 550.70 14
2006-01-28 Perforation 556.40 557.40 14
2006-01-28 Perforation 563.60 564.10 14
2006-01-28 Perforation 568.00 568.50 14
2006-01-28 Perforation 576.50 577.00 14
2006-01-28 Perforation 187.80 188.30 14
2006-01-28 Perforation 196.40 197.40 14
2006-01-28 Perforation 244.50 245.50 14
2006-01-28 Perforation 291.30 291.80 14
2006-01-28 Perforation 293.50 294.00 14
2006-01-28 Perforation 360.00 364.00 14
2006-01-28 Perforation 388.50 389.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5781 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8397 0.0 0.0 0.0
2010 8515 0.0 0.0 0.0
2011 8671 0.0 0.0 0.0
2012 8708 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 8609 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References