X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294251208000

Well Details

Well ID: 0294251208000
Loading map...
Location: 00/08-12-029-25W4/0
Location Alias: 00/08-12-29-25 W4M
Location Alias 2: 00/08-12-029-25 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 25
Section: 12
County/Municipality: Kneehill County
Well Name: EMBER ENTICE 8-12-29-25
Operator Name: Ember Resources Inc.
License Number: 0327484
License Date: 2005-03-02
License Status: Issued
Spud Date: 2005-03-18
Final Drill Date: 2005-03-18
Well Total Depth: 938.00 m
Surface Hole Latitude: 51.465139
Surface Hole Longitude: -113.381246

For data sources see[1][2]

Well History

Date Event
2005-03-02 Obtained License
2005-03-18 Finished Drilling
2005-03-18 Surface Casing Operation Performed
2005-03-18 Well Mode changed to Drilled and Cased
2005-03-19 Production Casing Operation Performed
2005-03-20 Rig Released
2005-04-07 Well Log Performed
2005-04-15 Perforation Treatment Performed - Jet Perforation
2005-04-15 Well Log Performed
2005-04-24 Perforation Treatment Performed - Fractured
2007-11-11 Well Began Production
2007-11-11 Well Fluid changed to Coalbed Methane-Coals Only
2007-11-11 Well Mode changed to Flowing
2007-11-22 Well Log Performed
2008-12-01 Well Log Performed
2009-10-13 Well Log Performed
2013-09-24 Well Log Performed
2015-10-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-04-15 Perforation 189.70 190.70 17
2005-04-15 Perforation 510.90 511.90 17
2005-04-15 Perforation 528.00 528.50 17
2005-04-15 Perforation 537.50 538.50 17
2005-04-15 Perforation 546.60 547.10 17
2005-04-15 Perforation 553.10 553.60 17
2005-04-15 Perforation 554.90 555.40 17
2005-04-15 Perforation 561.00 562.00 17
2005-04-15 Perforation 580.00 581.00 17
2005-04-24 Fracture 580.00 581.00 0
2005-04-24 Fracture 561.00 562.00 0
2005-04-15 Perforation 293.50 294.50 17
2005-04-24 Fracture 554.90 555.40 0
2005-04-24 Fracture 553.10 553.60 0
2005-04-24 Fracture 546.60 547.10 0
2005-04-24 Fracture 537.50 538.50 0
2005-04-24 Fracture 528.00 528.50 0
2005-04-24 Fracture 510.90 511.90 0
2005-04-24 Fracture 487.00 488.50 0
2005-04-24 Fracture 483.00 484.50 0
2005-04-24 Fracture 468.00 470.00 0
2005-04-24 Fracture 440.80 441.80 0
2005-04-15 Perforation 421.50 422.50 17
2005-04-24 Fracture 431.50 432.50 0
2005-04-24 Fracture 428.90 429.40 0
2005-04-24 Fracture 421.50 422.50 0
2005-04-24 Fracture 293.50 294.50 0
2005-04-24 Fracture 189.70 190.70 0
2005-04-15 Perforation 428.90 429.40 17
2005-04-15 Perforation 431.50 432.50 17
2005-04-15 Perforation 440.80 441.80 17
2005-04-15 Perforation 468.00 470.00 17
2005-04-15 Perforation 483.00 484.50 17
2005-04-15 Perforation 487.00 488.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 1224 0.0 0.0 0.0
2008 8034 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 7955 0.0 0.0 0.0
2012 8499 0.0 0.0 0.0
2013 8500 0.0 0.0 0.0
2014 8523 0.0 0.0 0.0
2015 8736 0.0 0.0 0.0
2016 8758 0.0 0.0 0.0
2017 8135 0.0 0.0 0.0
2018 5312 0.0 0.0 0.0
2019 8312 0.0 0.0 0.0
2020 2030 0.0 0.0 0.0

For data sources see[5]

References