If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0294252406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.495493,"lon":-113.394172,"icon":""}]} |
| Location: 00/06-24-029-25W4/0 | |
| Location Alias: 00/06-24-29-25 W4M | |
| Location Alias 2: 00/06-24-029-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 029 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 24 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER SWALWELL 6-24-29-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0062077 | |
| License Date: 1977-01-12 | |
| License Status: Suspension | |
| Spud Date: 1977-01-26 | |
| Final Drill Date: 1977-02-05 | |
| Well Total Depth: 1726.70 m | |
| Surface Hole Latitude: 51.495493 | |
| Surface Hole Longitude: -113.394172 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1977-01-12 | Obtained License |
| 1977-01-30 | Drill Stem Test Performed |
| 1977-02-05 | Finished Drilling |
| 1977-02-05 | Well Mode changed to Drilled and Cased |
| 1977-02-06 | Drill Stem Test Performed |
| 1977-02-07 | Drill Stem Test Performed |
| 1977-02-08 | Production Casing Operation Performed |
| 1977-02-16 | Perforation Treatment Performed - Jet Perforation |
| 1977-02-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1977-02-19 | Perforation Treatment Performed - Jet Perforation |
| 1977-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1977-02-22 | Perforation Treatment Performed - Jet Perforation |
| 1977-02-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1977-02-25 | Perforation Treatment Performed - Jet Perforation |
| 1977-02-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1977-02-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1977-03-02 | Perforation Treatment Performed - Jet Perforation |
| 1977-03-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1977-03-05 | Well Began Production |
| 1977-03-05 | Well Fluid changed to Crude Oil |
| 1977-03-05 | Well Mode changed to Flowing |
| 1979-03-01 | Well Fluid changed to Crude Oil |
| 1979-03-01 | Well Mode changed to Pumping |
| 1985-07-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1989-10-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1989-10-04 | Plug Back Performed |
| 1989-10-04 | Well Fluid changed to Crude Oil |
| 1989-10-04 | Well Mode changed to Abandoned Zone |
| 1992-09-11 | Perforation Treatment Performed - Jet Perforation |
| 1992-09-11 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1977-02-16 | Perforation | 1710.80 | 1713.90 | 7 |
| 1977-02-26 | Acid Treatment | 1676.40 | 1683.70 | 0 |
| 1977-02-28 | Acid Treatment | 1676.40 | 1683.70 | 0 |
| 1977-03-02 | Perforation | 1660.90 | 1667.00 | 7 |
| 1977-03-03 | Acid Treatment | 1660.90 | 1667.00 | 0 |
| 1985-07-23 | Acid Treatment | 1660.90 | 1683.70 | 0 |
| 1989-10-04 | Packing Device Capped w/Cement | 1641.00 | 1649.00 | 0 |
| 1992-09-11 | Perforation | 807.70 | 810.20 | 14 |
| 1992-09-11 | Perforation | 811.40 | 814.40 | 14 |
| 1977-02-17 | Acid Treatment | 1710.80 | 1713.90 | 0 |
| 1977-02-19 | Perforation | 1702.00 | 1706.60 | 7 |
| 1977-02-20 | Acid Treatment | 1702.00 | 1706.60 | 0 |
| 1977-02-22 | Perforation | 1702.00 | 1703.20 | 7 |
| 1977-02-22 | Perforation | 1705.10 | 1706.30 | 7 |
| 1977-02-23 | Acid Treatment | 1702.00 | 1706.60 | 0 |
| 1977-02-25 | Perforation | 1676.40 | 1678.20 | 7 |
| 1977-02-25 | Perforation | 1681.60 | 1683.70 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1977 | 4851 | 0.0 | 0.0 | 0.0 |
| 1978 | 4887 | 0.0 | 0.0 | 0.0 |
| 1979 | 3532 | 0.0 | 0.0 | 0.0 |
| 1980 | 3778 | 0.0 | 0.0 | 0.0 |
| 1981 | 5496 | 0.0 | 0.0 | 0.0 |
| 1982 | 5687 | 0.0 | 0.0 | 0.0 |
| 1983 | 5084 | 0.0 | 0.0 | 0.0 |
| 1984 | 7962 | 0.0 | 0.0 | 0.0 |
| 1985 | 8069 | 0.0 | 0.0 | 0.0 |
| 1986 | 7356 | 0.0 | 0.0 | 0.0 |
| 1987 | 7151 | 0.0 | 0.0 | 0.0 |
| 1988 | 8779 | 0.0 | 0.0 | 0.0 |
| 1989 | 4837 | 0.0 | 0.0 | 0.0 |
For data sources see[5]