X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294260108000

Well Details

Well ID: 0294260108000
Loading map...
Location: 00/08-01-029-26W4/0
Location Alias: 00/08-01-29-26 W4M
Location Alias 2: 00/08-01-029-26 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 26
Section: 01
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 8-1-29-26
Operator Name: Ember Resources Inc.
License Number: 0401778
License Date: 2008-10-03
License Status: Issued
Spud Date: 2008-11-24
Final Drill Date: 2008-11-25
Well Total Depth: 1385.00 m
Surface Hole Latitude: 51.459211
Surface Hole Longitude: -113.522795

For data sources see[1][2]

Well History

Date Event
2008-10-03 Obtained License
2008-11-24 Direction Drilling Operation Performed - Deviate
2008-11-24 Surface Casing Operation Performed
2008-11-25 Finished Drilling
2008-11-25 Well Mode changed to Drilled and Cased
2008-11-26 Production Casing Operation Performed
2008-11-26 Rig Released
2008-11-29 Well Log Performed
2008-12-08 Perforation Treatment Performed - Jet Perforation
2009-01-30 Perforation Treatment Performed - Fractured
2009-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-16 Perforation Treatment Performed - Jet Perforation
2009-02-16 Plug Back Performed
2009-02-16 Well Mode changed to Abandoned Zone
2009-02-26 Perforation Treatment Performed - Jet Perforation
2009-03-04 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-11-24 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-12-08 Perforation 990.50 993.50 13
2009-02-26 Perforation 670.30 670.80 14
2009-02-26 Perforation 509.60 510.60 14
2009-02-26 Perforation 342.10 343.10 14
2009-02-26 Perforation 653.00 655.00 14
2009-02-26 Perforation 501.50 503.50 14
2009-02-26 Perforation 370.40 370.90 14
2009-02-26 Perforation 354.90 355.40 14
2009-02-26 Perforation 350.10 351.10 14
2009-02-26 Perforation 729.00 730.00 14
2009-02-26 Perforation 878.60 879.60 14
2009-01-30 Fracture 990.50 993.50 0
2009-02-26 Perforation 876.80 877.30 14
2009-02-26 Perforation 865.70 866.70 14
2009-02-26 Perforation 906.80 907.30 14
2009-02-26 Perforation 902.60 903.10 14
2009-02-26 Perforation 886.30 887.30 14
2009-02-26 Perforation 836.60 837.10 14
2009-02-26 Perforation 790.00 790.50 14
2009-02-26 Perforation 758.20 758.70 14
2009-02-26 Perforation 736.80 737.30 14
2009-02-26 Perforation 818.80 819.80 14
2009-02-16 Perforation 780.00 784.00 13
2009-02-26 Perforation 828.60 829.10 14
2009-02-26 Perforation 815.30 818.30 14
2009-03-04 Fracture 501.50 655.00 0
2009-03-04 Fracture 342.10 907.30 0
2009-02-16 Packing Device Capped w/Cement 975.80 983.80 0
2009-02-26 Perforation 667.00 668.00 14
2009-02-26 Perforation 529.00 529.50 14
2009-02-26 Perforation 522.00 522.50 14
2009-02-26 Perforation 704.50 705.00 14
2009-02-26 Perforation 687.00 689.00 14

For data sources see[5]



References