X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294260702000

Well Details

Well ID: 0294260702000
Loading map...
Location: 00/02-07-029-26W4/0
Location Alias: 00/02-07-29-26 W4M
Location Alias 2: 00/02-07-029-26 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 26
Section: 07
County/Municipality: Kneehill County
Well Name: EMBER ET AL IRCANA 2-7-29-26
Operator Name: Ember Resources Inc.
License Number: 0417211
License Date: 2010-01-13
License Status: Issued
Spud Date: 2010-01-20
Final Drill Date: 2010-01-21
Well Total Depth: 1084.00 m
Surface Hole Latitude: 51.462606
Surface Hole Longitude: -113.645391

For data sources see[1][2]

Well History

Date Event
2010-01-13 Obtained License
2010-01-20 Surface Casing Operation Performed
2010-01-21 Finished Drilling
2010-01-21 Production Casing Operation Performed
2010-01-21 Well Mode changed to Drilled and Cased
2010-01-22 Rig Released
2010-01-29 Well Log Performed
2010-02-06 Perforation Treatment Performed - Jet Perforation
2010-02-06 Well Log Performed
2010-02-08 Perforation Treatment Performed - Fractured
2010-03-01 Well Began Production
2010-03-01 Well Fluid changed to Coalbed Methane-Coals and Other
2010-03-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-06 Perforation 731.30 731.80 13
2010-02-06 Perforation 639.80 640.30 13
2010-02-06 Perforation 636.60 637.60 13
2010-02-06 Perforation 629.40 629.90 13
2010-02-06 Perforation 624.20 625.20 13
2010-02-06 Perforation 621.00 622.00 13
2010-02-06 Perforation 611.00 611.50 13
2010-02-06 Perforation 602.60 603.10 13
2010-02-06 Perforation 582.60 583.10 13
2010-02-06 Perforation 569.60 570.10 13
2010-02-06 Perforation 566.70 567.20 13
2010-02-06 Perforation 722.70 723.20 13
2010-02-06 Perforation 561.30 561.80 13
2010-02-06 Perforation 556.50 557.00 13
2010-02-06 Perforation 529.50 530.50 13
2010-02-06 Perforation 524.90 525.90 13
2010-02-06 Perforation 508.80 509.30 13
2010-02-06 Perforation 498.30 498.80 13
2010-02-06 Perforation 445.30 445.80 13
2010-02-06 Perforation 429.50 430.00 13
2010-02-06 Perforation 425.20 425.70 13
2010-02-06 Perforation 385.80 386.80 13
2010-02-06 Perforation 719.20 719.70 13
2010-02-06 Perforation 369.30 370.30 13
2010-02-06 Perforation 329.30 329.80 13
2010-02-06 Perforation 318.90 319.40 13
2010-02-06 Perforation 317.10 317.60 13
2010-02-06 Perforation 310.10 310.60 13
2010-02-06 Perforation 303.80 304.30 13
2010-02-06 Perforation 297.80 298.30 13
2010-02-06 Perforation 863.80 864.80 17
2010-02-06 Perforation 806.90 807.40 17
2010-02-06 Perforation 780.60 781.60 17
2010-02-06 Perforation 701.50 706.50 13
2010-02-06 Perforation 775.40 775.90 17
2010-02-08 Fracture 863.80 864.80 0
2010-02-08 Fracture 806.90 807.40 0
2010-02-08 Fracture 780.60 781.60 0
2010-02-08 Fracture 775.40 775.90 0
2010-02-08 Fracture 731.30 731.80 0
2010-02-08 Fracture 722.70 723.20 0
2010-02-08 Fracture 719.20 719.70 0
2010-02-08 Fracture 701.50 706.50 0
2010-02-08 Fracture 690.50 691.50 0
2010-02-06 Perforation 690.50 691.50 13
2010-02-08 Fracture 675.00 675.50 0
2010-02-08 Fracture 669.10 669.60 0
2010-02-08 Fracture 657.90 658.40 0
2010-02-08 Fracture 655.50 656.50 0
2010-02-08 Fracture 639.80 640.30 0
2010-02-08 Fracture 636.60 637.60 0
2010-02-08 Fracture 629.40 629.90 0
2010-02-08 Fracture 624.20 625.20 0
2010-02-08 Fracture 621.00 622.00 0
2010-02-08 Fracture 611.00 611.50 0
2010-02-06 Perforation 675.00 675.50 13
2010-02-08 Fracture 602.60 603.10 0
2010-02-08 Fracture 582.60 583.10 0
2010-02-08 Fracture 569.60 570.10 0
2010-02-08 Fracture 566.70 567.20 0
2010-02-08 Fracture 561.30 561.80 0
2010-02-08 Fracture 556.50 557.00 0
2010-02-08 Fracture 529.50 530.50 0
2010-02-08 Fracture 524.90 525.90 0
2010-02-08 Fracture 508.80 509.30 0
2010-02-08 Fracture 498.30 498.80 0
2010-02-06 Perforation 669.10 669.60 13
2010-02-08 Fracture 445.30 445.80 0
2010-02-08 Fracture 429.50 430.00 0
2010-02-08 Fracture 425.20 425.70 0
2010-02-08 Fracture 385.80 386.80 0
2010-02-08 Fracture 369.30 370.30 0
2010-02-08 Fracture 329.30 329.80 0
2010-02-08 Fracture 318.90 319.40 0
2010-02-08 Fracture 317.10 317.60 0
2010-02-08 Fracture 310.10 310.60 0
2010-02-08 Fracture 303.80 304.30 0
2010-02-06 Perforation 657.90 658.40 13
2010-02-08 Fracture 297.80 298.30 0
2010-02-06 Perforation 655.50 656.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7241 0.0 0.0 0.0
2011 8636 0.0 0.0 0.0
2012 8746 0.0 0.0 0.0
2013 8725 0.0 0.0 0.0
2014 4031 0.0 0.0 0.0
2015 4409 0.0 0.0 0.0
2016 8720 0.0 0.0 0.0
2017 8740 0.0 0.0 0.0
2018 8754 0.0 0.0 0.0
2019 8684 0.0 0.0 0.0
2020 1158 0.0 0.0 0.0

For data sources see[5]

References