X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294260704000

Well Details

Well ID: 0294260704000
Loading map...
Location: 00/04-07-029-26W4/0
Location Alias: 00/04-07-29-26 W4M
Location Alias 2: 00/04-07-029-26 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 26
Section: 07
County/Municipality: Kneehill County
Well Name: EMBER ET AL IRCANA 4-7-29-26
Operator Name: Ember Resources Inc.
License Number: 0417517
License Date: 2010-01-18
License Status: Issued
Spud Date: 2010-01-19
Final Drill Date: 2010-01-20
Well Total Depth: 1100.00 m
Surface Hole Latitude: 51.462606
Surface Hole Longitude: -113.656257

For data sources see[1][2]

Well History

Date Event
2010-01-18 Obtained License
2010-01-19 Surface Casing Operation Performed
2010-01-20 Finished Drilling
2010-01-20 Production Casing Operation Performed
2010-01-20 Well Mode changed to Drilled and Cased
2010-01-21 Rig Released
2010-01-24 Well Log Performed
2010-02-03 Perforation Treatment Performed - Jet Perforation
2010-02-03 Well Log Performed
2010-02-05 Perforation Treatment Performed - Fractured
2010-02-18 Well Began Production
2010-02-18 Well Fluid changed to Coalbed Methane-Coals Only
2010-02-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-03 Perforation 749.80 750.30 13
2010-02-03 Perforation 674.90 675.40 13
2010-02-03 Perforation 672.60 673.60 13
2010-02-03 Perforation 655.90 657.90 13
2010-02-03 Perforation 638.00 642.50 13
2010-02-03 Perforation 625.80 626.30 13
2010-02-03 Perforation 617.90 618.40 13
2010-02-03 Perforation 599.20 599.70 13
2010-02-03 Perforation 587.20 587.70 13
2010-02-03 Perforation 583.20 584.20 13
2010-02-03 Perforation 577.50 578.50 13
2010-02-03 Perforation 741.60 742.10 13
2010-02-03 Perforation 574.70 575.20 13
2010-02-03 Perforation 569.50 570.00 13
2010-02-03 Perforation 526.40 526.90 13
2010-02-03 Perforation 516.00 516.50 13
2010-02-03 Perforation 506.00 507.00 13
2010-02-03 Perforation 471.20 471.70 13
2010-02-03 Perforation 465.30 465.80 13
2010-02-03 Perforation 451.50 452.00 13
2010-02-03 Perforation 417.00 417.50 13
2010-02-03 Perforation 353.30 353.80 13
2010-02-03 Perforation 737.70 738.20 13
2010-02-03 Perforation 344.20 345.20 13
2010-02-03 Perforation 335.50 336.00 13
2010-02-03 Perforation 327.80 328.30 13
2010-02-03 Perforation 321.20 321.70 13
2010-02-03 Perforation 960.70 963.70 17
2010-02-03 Perforation 923.00 924.50 17
2010-02-03 Perforation 815.30 815.80 17
2010-02-05 Fracture 960.70 963.70 0
2010-02-05 Fracture 923.00 924.50 0
2010-02-05 Fracture 815.30 815.80 0
2010-02-03 Perforation 733.50 734.50 13
2010-02-05 Fracture 749.80 750.30 0
2010-02-05 Fracture 741.60 742.10 0
2010-02-05 Fracture 737.70 738.20 0
2010-02-05 Fracture 733.50 734.50 0
2010-02-05 Fracture 719.00 723.00 0
2010-02-05 Fracture 716.40 717.40 0
2010-02-05 Fracture 707.00 707.50 0
2010-02-05 Fracture 689.90 690.40 0
2010-02-05 Fracture 684.90 685.40 0
2010-02-05 Fracture 674.90 675.40 0
2010-02-03 Perforation 719.00 723.00 13
2010-02-05 Fracture 672.60 673.60 0
2010-02-05 Fracture 655.90 657.90 0
2010-02-05 Fracture 638.00 642.50 0
2010-02-05 Fracture 625.80 626.30 0
2010-02-05 Fracture 617.90 618.40 0
2010-02-05 Fracture 599.20 599.70 0
2010-02-05 Fracture 587.20 587.70 0
2010-02-05 Fracture 583.20 584.20 0
2010-02-05 Fracture 577.50 578.50 0
2010-02-05 Fracture 574.70 575.20 0
2010-02-03 Perforation 716.40 717.40 13
2010-02-05 Fracture 569.50 570.00 0
2010-02-05 Fracture 526.40 526.90 0
2010-02-05 Fracture 516.00 516.50 0
2010-02-05 Fracture 506.00 507.00 0
2010-02-05 Fracture 471.20 471.70 0
2010-02-05 Fracture 465.30 465.80 0
2010-02-05 Fracture 451.50 452.00 0
2010-02-05 Fracture 417.00 417.50 0
2010-02-05 Fracture 353.30 353.80 0
2010-02-05 Fracture 344.20 345.20 0
2010-02-03 Perforation 707.00 707.50 13
2010-02-05 Fracture 335.50 336.00 0
2010-02-05 Fracture 327.80 328.30 0
2010-02-05 Fracture 321.20 321.70 0
2010-02-03 Perforation 689.90 690.40 13
2010-02-03 Perforation 684.90 685.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7451 0.0 0.0 0.0
2011 8640 0.0 0.0 0.0
2012 8754 0.0 0.0 0.0
2013 8732 0.0 0.0 0.0
2014 4703 0.0 0.0 0.0
2015 5253 0.0 0.0 0.0
2016 8726 0.0 0.0 0.0
2017 8743 0.0 0.0 0.0
2018 8754 0.0 0.0 0.0
2019 8658 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References