X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294262102000

Well Details

Well ID: 0294262102000
Loading map...
Location: 00/02-21-029-26W4/0
Location Alias: 00/02-21-29-26 W4M
Location Alias 2: 00/02-21-029-26 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 26
Section: 21
County/Municipality: Kneehill County
Well Name: NAL SWALWELL 2-21-29-26
Operator Name: NAL Resources Limited
License Number: 0372868
License Date: 2007-01-23
License Status: Suspension
Spud Date: 2007-06-29
Final Drill Date: 2007-07-26
Well Total Depth: 3336.00 m
Surface Hole Latitude: 51.489815
Surface Hole Longitude: -113.617358

For data sources see[1][2]

Well History

Date Event
2007-01-23 Obtained License
2007-06-30 Lost Circulation Occurred
2007-07-02 Surface Casing Operation Performed
2007-07-08 Direction Drilling Operation Performed - Horizontal
2007-07-16 Intermediate Casing Operation Performed
2007-07-16 Liner Casing Operation Performed
2007-07-16 Perforation Treatment Performed - Open-Hole Completion
2007-07-26 Finished Drilling
2007-07-26 Well Log Performed
2007-07-26 Well Mode changed to Drilled and Cased
2007-08-01 Rig Released
2007-08-15 Perforation Treatment Performed - Multi-Stage Fracture
2007-09-04 Well Began Production
2007-09-04 Well Fluid changed to Crude Oil
2007-09-04 Well Mode changed to Pumping
2007-11-27 Well Log Performed
2008-07-25 Perforation Treatment Performed - Multi-Stage Fracture
2008-08-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-01 Well Fluid changed to Crude Oil
2017-02-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-07-08 1735.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-07-16 Open Hole/Barefoot Completion 3272.00 3336.00 0
2008-07-25 Multi-Stage Fracture 3120.90 3121.00 0
2008-08-25 Multi-Stage Fracture 3002.10 3002.20 0
2008-08-25 Multi-Stage Fracture 2871.00 2871.10 0
2008-08-25 Multi-Stage Fracture 2739.00 2739.10 0
2008-08-25 Multi-Stage Fracture 2607.00 2607.10 0
2008-08-25 Multi-Stage Fracture 2475.00 2475.10 0
2007-08-15 Multi-Stage Fracture 3264.90 3265.00 0
2007-08-15 Multi-Stage Fracture 3120.90 3121.00 0
2007-08-15 Multi-Stage Fracture 3002.10 3002.20 0
2007-08-15 Multi-Stage Fracture 2871.00 2871.10 0
2007-08-15 Multi-Stage Fracture 2739.00 2739.10 0
2007-08-15 Multi-Stage Fracture 2607.00 2607.10 0
2007-08-15 Multi-Stage Fracture 2475.00 2475.10 0
2008-07-25 Multi-Stage Fracture 3264.90 3265.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 2787 0.0 0.0 0.0
2008 6571 0.0 0.0 0.0
2009 8252 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 8648 0.0 0.0 0.0
2012 8337 0.0 0.0 0.0
2013 8655 0.0 0.0 0.0
2014 4795 0.0 0.0 0.0
2015 588 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2007-06-30 Lost Circulation 162.00 162.00

For data sources see[7]

References