X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294262808020

Well Details

Well ID: 0294262808020
Loading map...
Location: 02/08-28-029-26W4/0
Location Alias: 02/08-28-29-26 W4M
Location Alias 2: 02/08-28-029-26 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 26
Section: 28
County/Municipality: Kneehill County
Well Name: EMBER 102 SWALWELL 8-28-29-26
Operator Name: Ember Resources Inc.
License Number: 0381498
License Date: 2007-09-06
License Status: Issued
Spud Date: 2008-01-17
Final Drill Date: 2008-01-18
Well Total Depth: 998.00 m
Surface Hole Latitude: 51.509806
Surface Hole Longitude: -113.592128

For data sources see[1][2]

Well History

Date Event
2007-09-06 Obtained License
2008-01-17 Surface Casing Operation Performed
2008-01-18 Finished Drilling
2008-01-18 Well Log Performed
2008-01-18 Well Mode changed to Drilled and Cased
2008-01-19 Production Casing Operation Performed
2008-01-19 Rig Released
2008-01-22 Well Log Performed
2008-01-23 Well Log Performed
2008-01-31 Perforation Treatment Performed - Jet Perforation
2008-02-02 Perforation Treatment Performed - Fractured
2008-03-16 Well Began Production
2008-03-16 Well Fluid changed to Coalbed Methane-Coals and Other
2008-03-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-31 Perforation 647.70 648.70 13
2008-01-31 Perforation 581.50 582.00 13
2008-01-31 Perforation 558.60 561.10 13
2008-01-31 Perforation 493.30 493.80 13
2008-01-31 Perforation 483.60 484.60 13
2008-01-31 Perforation 478.00 479.00 13
2008-01-31 Perforation 372.40 372.90 13
2008-01-31 Perforation 363.50 364.50 13
2008-01-31 Perforation 254.80 255.80 13
2008-01-31 Perforation 249.30 250.30 13
2008-01-31 Perforation 231.10 231.60 13
2008-01-31 Perforation 637.50 638.50 13
2008-02-02 Fracture 647.70 648.70 0
2008-02-02 Fracture 637.50 638.50 0
2008-02-02 Fracture 634.70 635.70 0
2008-02-02 Fracture 633.20 633.70 0
2008-02-02 Fracture 624.60 625.60 0
2008-02-02 Fracture 620.30 621.80 0
2008-02-02 Fracture 615.10 616.60 0
2008-02-02 Fracture 601.30 602.30 0
2008-02-02 Fracture 599.50 600.00 0
2008-02-02 Fracture 581.50 582.00 0
2008-01-31 Perforation 634.70 635.70 13
2008-02-02 Fracture 558.60 561.10 0
2008-02-02 Fracture 493.30 493.80 0
2008-02-02 Fracture 483.60 484.60 0
2008-02-02 Fracture 478.00 479.00 0
2008-02-02 Fracture 372.40 372.90 0
2008-02-02 Fracture 363.50 364.50 0
2008-02-02 Fracture 254.80 255.80 0
2008-02-02 Fracture 249.30 250.30 0
2008-02-02 Fracture 231.10 231.60 0
2008-01-31 Perforation 633.20 633.70 13
2008-01-31 Perforation 624.60 625.60 13
2008-01-31 Perforation 620.30 621.80 13
2008-01-31 Perforation 615.10 616.60 13
2008-01-31 Perforation 601.30 602.30 13
2008-01-31 Perforation 599.50 600.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 5072 0.0 0.0 0.0
2009 6178 0.0 0.0 0.0
2010 7548 0.0 0.0 0.0
2011 8615 0.0 0.0 0.0
2012 8673 0.0 0.0 0.0
2013 8753 0.0 0.0 0.0
2014 4703 0.0 0.0 0.0
2015 5252 0.0 0.0 0.0
2016 8683 0.0 0.0 0.0
2017 8748 0.0 0.0 0.0
2018 8682 0.0 0.0 0.0
2019 8753 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References