If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294273408002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.529025,"lon":-113.710727,"icon":""}]} |
Location: 00/08-34-029-27W4/2 | |
Location Alias: 00/08-34-29-27 W4M | |
Location Alias 2: 00/08-34-029-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 27 | |
Section: 34 | |
County/Municipality: Mountain View County | |
Well Name: EMBER ET AL LPINECK 8-34-29-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0252883 | |
License Date: 2001-03-14 | |
License Status: Amended | |
Spud Date: 2001-03-20 | |
Final Drill Date: 2001-05-01 | |
Well Total Depth: 2658.00 m | |
Surface Hole Latitude: 51.529025 | |
Surface Hole Longitude: -113.710727 |
Date | Event |
---|---|
2001-03-14 | Obtained License |
2001-03-23 | Surface Casing Operation Performed |
2001-03-26 | Direction Drilling Operation Performed - Horizontal |
2001-04-08 | Well Log Performed |
2001-04-09 | Intermediate Casing Operation Performed |
2001-04-14 | Well Log Performed |
2001-04-23 | Well Log Performed |
2001-05-01 | Finished Drilling |
2001-05-01 | Well Log Performed |
2001-05-01 | Well Mode changed to Drilled and Cased |
2001-05-03 | Perforation Treatment Performed - Open-Hole Completion |
2001-05-03 | Rig Released |
2001-06-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-06-13 | Perforation Treatment Performed - Chemical Squeeze |
2001-06-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-09-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-09-09 | Plug Back Performed |
2005-09-09 | Well Log Performed |
2006-04-04 | Perforation Treatment Performed - Jet Perforation |
2006-04-05 | Perforation Treatment Performed - Jet Perforation |
2006-05-16 | Perforation Treatment Performed - Fractured |
2006-05-26 | Well Fluid changed to Gas |
2006-05-26 | Well Mode changed to Testing |
2011-03-14 | Well Began Production |
2011-03-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-14 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2001-03-26 | 595.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-05-03 | Open Hole/Barefoot Completion | 2078.00 | 2658.00 | 0 |
2006-04-04 | Perforation | 543.00 | 544.00 | 13 |
2006-04-04 | Perforation | 607.00 | 608.00 | 13 |
2006-04-04 | Perforation | 609.50 | 610.00 | 13 |
2006-04-04 | Perforation | 618.00 | 619.00 | 13 |
2006-04-04 | Perforation | 620.00 | 621.00 | 13 |
2006-04-04 | Perforation | 692.00 | 694.00 | 13 |
2006-04-04 | Perforation | 709.50 | 710.50 | 13 |
2006-04-04 | Perforation | 726.50 | 727.00 | 13 |
2006-04-04 | Perforation | 728.50 | 729.00 | 13 |
2006-04-04 | Perforation | 731.00 | 732.00 | 13 |
2001-06-12 | Acid Treatment | 2078.00 | 2658.00 | 0 |
2006-04-04 | Perforation | 751.00 | 752.00 | 13 |
2006-04-04 | Perforation | 752.50 | 753.50 | 13 |
2006-04-04 | Perforation | 758.00 | 760.00 | 13 |
2006-04-04 | Perforation | 765.00 | 765.50 | 13 |
2006-04-04 | Perforation | 766.50 | 767.00 | 13 |
2006-04-04 | Perforation | 770.50 | 771.50 | 13 |
2006-04-04 | Perforation | 777.00 | 777.50 | 13 |
2006-04-04 | Perforation | 779.00 | 780.00 | 13 |
2006-04-04 | Perforation | 783.50 | 784.00 | 13 |
2006-04-04 | Perforation | 785.50 | 786.00 | 13 |
2001-06-13 | Chemical Squeeze | 2078.00 | 2658.00 | 0 |
2006-04-05 | Perforation | 419.00 | 420.00 | 13 |
2006-04-05 | Perforation | 447.50 | 448.00 | 13 |
2006-04-05 | Perforation | 461.00 | 462.00 | 13 |
2006-04-05 | Perforation | 487.50 | 488.00 | 13 |
2006-04-05 | Perforation | 510.00 | 510.50 | 13 |
2006-04-05 | Perforation | 518.00 | 520.00 | 13 |
2006-05-16 | Fracture | 419.00 | 784.00 | 0 |
2001-06-14 | Acid Treatment | 2078.00 | 2658.00 | 0 |
2005-09-09 | Packing Device Capped w/Cement | 2062.00 | 2070.00 | 0 |
2006-04-04 | Perforation | 522.00 | 523.00 | 13 |
2006-04-04 | Perforation | 530.50 | 531.50 | 13 |
2006-04-04 | Perforation | 533.00 | 534.00 | 13 |
2006-04-04 | Perforation | 536.50 | 537.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 96 | 0.0 | 0.0 | 0.0 |
2011 | 6909 | 0.0 | 0.0 | 0.0 |
2012 | 8746 | 0.0 | 0.0 | 0.0 |
2013 | 8736 | 0.0 | 0.0 | 0.0 |
2014 | 6167 | 0.0 | 0.0 | 0.0 |
2015 | 8740 | 0.0 | 0.0 | 0.0 |
2016 | 8722 | 0.0 | 0.0 | 0.0 |
2017 | 8712 | 0.0 | 0.0 | 0.0 |
2018 | 8616 | 0.0 | 0.0 | 0.0 |
2019 | 8543 | 0.0 | 0.0 | 0.0 |
2020 | 2163 | 0.0 | 0.0 | 0.0 |
For data sources see[6]