If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0294281107000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.466492,"lon":-113.834298,"icon":""}]} |
| Location: 00/07-11-029-28W4/0 | |
| Location Alias: 00/07-11-29-28 W4M | |
| Location Alias 2: 00/07-11-029-28 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 029 | |
| Meridian: 4 | |
| Range: 28 | |
| Section: 11 | |
| County/Municipality: Mountain View County | |
| Well Name: EMBER LPINECK 7-11-29-28 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0410607 | |
| License Date: 2009-05-25 | |
| License Status: Amended | |
| Spud Date: 2009-12-08 | |
| Final Drill Date: 2010-01-08 | |
| Well Total Depth: 1192.00 m | |
| Surface Hole Latitude: 51.466492 | |
| Surface Hole Longitude: -113.834298 |
| Date | Event |
|---|---|
| 2009-05-25 | Obtained License |
| 2009-12-08 | Lost Circulation Occurred |
| 2009-12-08 | Surface Casing Operation Performed |
| 2010-01-08 | Finished Drilling |
| 2010-01-08 | Production Casing Operation Performed |
| 2010-01-08 | Rig Released |
| 2010-01-08 | Well Mode changed to Drilled and Cased |
| 2010-01-20 | Well Log Performed |
| 2010-02-10 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-22 | Well Fluid changed to Gas |
| 2010-02-22 | Well Mode changed to Testing |
| 2010-03-10 | Well Began Production |
| 2010-03-10 | Well Fluid changed to Gas |
| 2010-03-10 | Well Mode changed to Flowing |
| 2012-01-08 | Perforation Treatment Performed - Jet Perforation |
| 2012-01-20 | Perforation Treatment Performed - Fractured |
| 2012-01-28 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2012-01-28 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-02-10 | Perforation | 1124.00 | 1126.00 | 13 |
| 2012-01-08 | Perforation | 440.50 | 441.50 | 13 |
| 2012-01-08 | Perforation | 446.90 | 447.40 | 13 |
| 2012-01-08 | Perforation | 551.50 | 552.00 | 13 |
| 2012-01-08 | Perforation | 571.80 | 572.30 | 13 |
| 2012-01-08 | Perforation | 652.00 | 655.00 | 13 |
| 2012-01-08 | Perforation | 665.00 | 667.00 | 13 |
| 2012-01-08 | Perforation | 673.10 | 673.60 | 13 |
| 2012-01-08 | Perforation | 689.70 | 690.70 | 13 |
| 2012-01-08 | Perforation | 694.50 | 695.00 | 13 |
| 2012-01-08 | Perforation | 760.50 | 763.00 | 13 |
| 2010-02-10 | Perforation | 1100.00 | 1102.00 | 13 |
| 2012-01-08 | Perforation | 780.30 | 780.80 | 13 |
| 2012-01-08 | Perforation | 783.50 | 784.50 | 13 |
| 2012-01-08 | Perforation | 791.40 | 791.90 | 13 |
| 2012-01-08 | Perforation | 800.10 | 800.60 | 13 |
| 2012-01-08 | Perforation | 815.10 | 815.60 | 13 |
| 2012-01-08 | Perforation | 823.80 | 825.80 | 13 |
| 2012-01-20 | Fracture | 383.00 | 825.80 | 0 |
| 2010-02-10 | Perforation | 1031.00 | 1034.00 | 13 |
| 2010-02-10 | Perforation | 1001.00 | 1004.00 | 13 |
| 2010-02-10 | Perforation | 920.00 | 922.00 | 13 |
| 2010-02-10 | Perforation | 771.00 | 774.00 | 13 |
| 2012-01-08 | Perforation | 383.00 | 386.00 | 13 |
| 2012-01-08 | Perforation | 408.00 | 411.00 | 13 |
| 2012-01-08 | Perforation | 416.80 | 417.30 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 6786 | 0.0 | 0.0 | 0.0 |
| 2011 | 8755 | 0.0 | 0.0 | 0.0 |
| 2012 | 8710 | 0.0 | 0.0 | 0.0 |
| 2013 | 8567 | 0.0 | 0.0 | 0.0 |
| 2014 | 8747 | 0.0 | 0.0 | 0.0 |
| 2015 | 8742 | 0.0 | 0.0 | 0.0 |
| 2016 | 8760 | 0.0 | 0.0 | 0.0 |
| 2017 | 8669 | 0.0 | 0.0 | 0.0 |
| 2018 | 8400 | 0.0 | 0.0 | 0.0 |
| 2019 | 8660 | 0.0 | 0.0 | 0.0 |
| 2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2009-12-08 | Lost Circulation | 20.00 | 30.00 |
For data sources see[6]