X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294291403000

Well Details

Well ID: 0294291403000
Loading map...
Location: 00/03-14-029-29W4/0
Location Alias: 00/03-14-29-29 W4M
Location Alias 2: 00/03-14-029-29 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 29
Section: 14
County/Municipality: Rocky View County
Well Name: TRANSCAN PPL CROSSE 3-14-29-29
Operator Name: TransCanada Energy Ltd.
License Number: 0021286
License Date: 1961-09-01
License Status: Issued
Spud Date: 1961-09-04
Final Drill Date: 1961-10-23
Well Total Depth: 2650.20 m
Surface Hole Latitude: 51.476459
Surface Hole Longitude: -113.981099

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-09-01 Obtained License
1961-10-01 Drill Stem Test Performed
1961-10-20 Drill Stem Test Performed
1961-10-23 Finished Drilling
1961-10-24 Production Casing Operation Performed
1961-10-24 Well Mode changed to Drilled and Cased
1961-12-07 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-12-11 Perforation Treatment Performed - Fractured
1962-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-08-14 Perforation Treatment Performed - Acid Wash - No Pressure
1962-08-14 Perforation Treatment Performed - Jet Perforation
1967-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-19 Well Began Production
1976-02-19 Well Fluid changed to Gas
1976-02-19 Well Mode changed to Flowing
2011-10-01 Well Type changed to Observation
2018-09-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-12-07 Hydra Jet Perforation 2602.40 2602.40 0
1961-12-11 Acid Treatment 2602.40 2602.40 0
1961-12-11 Fracture 2602.40 2602.40 0
1962-02-03 Packing Device Capped w/Cement 2523.70 2523.70 0
1962-08-14 Perforation 2212.80 2220.50 7
1962-08-14 Acid Wash 2212.80 2220.50 0
1967-05-30 Acid Treatment 2212.80 2220.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1976 5290 0.0 0.0 0.0
1977 4941 0.0 0.0 0.0
1978 1447 0.0 0.0 0.0
1979 5369 0.0 0.0 0.0
1980 5693 0.0 0.0 0.0
1981 7036 0.0 0.0 0.0
1982 4419 0.0 0.0 0.0
1984 84 0.0 0.0 0.0
1989 258 0.0 0.0 0.0
1990 495 0.0 0.0 0.0
1991 5625 0.0 0.0 0.0
1992 6884 0.0 0.0 0.0
1993 1652 0.0 0.0 0.0
1994 1854 0.0 0.0 0.0
1995 120 0.0 0.0 0.0
1997 3575 0.0 0.0 0.0
1998 8278 0.0 0.0 0.0
1999 5828 0.0 0.0 0.0
2000 2231 0.0 0.0 0.0
2001 2430 0.0 0.0 0.0
2002 697 0.0 0.0 0.0
2003 2330 0.0 0.0 0.0
2004 8087 0.0 0.0 0.0
2005 8413 0.0 0.0 0.0
2006 4742 0.0 0.0 0.0

For data sources see[5]

References